Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support, is soliciting proposals for the repair of GENERATOR,PULSE units. This solicitation, identified as N0038326QPA710001, has been amended to extend the due date to March 13, 2026, and increase the quantity from 5 to 10 units.
Scope of Work
This opportunity requires the repair, testing, and inspection of GENERATOR,PULSE units (NIIN: 014941049, P/N: GP1552WR and 1552WR) to a Ready For Issue (RFI) condition. The contractor will be responsible for providing all necessary facilities, labor, materials, parts, and test/tooling equipment. Key aspects include adherence to a 37-day Repair Turnaround Time (RTAT) from asset receipt and providing a monthly throughput constraint. The induction expiration date is 365 days after contract award.
Contract & Timeline
- Type: Solicitation for Repair Services
- Notice ID: 8af7bbd62a6d4aed967e545c3d6f3782
- Quantity: 10 units (increased from 5)
- Set-Aside: None
- Response Due: March 13, 2026, 8:30 PM EST (extended)
- Published: February 21, 2026 (latest amendment)
- Agency: NAVSUP Weapon Systems Support
Key Requirements
Offerors must have Government Source Approval for these items. If not an approved source, detailed information from the NAVSUP WSS Source Approval Brochure must be submitted with the proposal. The contractor must establish and maintain a quality system compliant with ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3. All parts and materials used must be new, per FAR 52.211-5, unless PCO approval is obtained. Procedures for Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) are detailed, requiring DCMA concurrence and PCO approval. Early and incremental deliveries are accepted and preferred.
Submission Details
Quotes must be submitted via email to dana.n.knittel.civ@us.navy.mil by the specified due date. If a Firm Fixed Price (FFP) cannot be determined, the PCO must be informed.