Genesis Extrication Equipment
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The 5th Civil Engineering Squadron at Minot AFB has a requirement for one complete set of Genesis vehicle extrication tools. This is a Presolicitation notice, indicating that quotes will be solicited directly from vendors via email. The opportunity is designated as a Total Small Business Set-Aside.
Scope of Work
The requirement includes a complete set of Genesis vehicle extrication tools, specifically:
- SC240 SLi Nxt Gen Smooth Cut Blades 18V (Item No.: 1101550GRS)
- S54 SLi 32" Spreader 18V (Item No.: 1100143GRS)
- 21-36 SLi Ram 18V (Item No.: 1103096GRS)
- eForce Ram Kit w/12" Extension & V-Heads (Item No.: ART.011.520.5)
- Genesis 3 Bay Charger w/M18 Rapid Chargers 18V (Item No.: ART.205.410.9)
- M18 8Ah Milwaukee Battery (Item No.: ART.205.181.8)
Contract & Timeline
- Opportunity Type: Presolicitation
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 5130 (Hand Tools, Power Driven)
- Notice Response Date: June 23, 2026, 4:00 PM ET
- Published Date: June 4, 2026, 1:25 PM ET
- Place of Performance: Minot AFB, ND 58704, United States
Additional Notes
This presolicitation notice is not a request for quote or solicitation. Quotes will be solicited directly from vendors via email, in accordance with RFO 12.201-1(e)(1). Funds are not presently available for this effort, and no award will be made until funds are secured. The Government reserves the right to cancel this solicitation without obligation to reimburse offerors for costs. If funds become available, an award is anticipated prior to September 30, 2026.
Contact Information
- Primary: SSgt Tyler Buckley (tyler.buckley.5@us.af.mil, 701-723-2262)
- Secondary: Ted Arneson (theodore.arneson@us.af.mil, 701-723-3949)