Geothermal Generation - Slim Well, F. E. Warren AFB, Wyoming
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Am-0005 - Revised proposal due date and revised proposal acceptance period //Am-0004 - Updated Wage Determination, revised proposal due date, and proposal acceptance period // Am-0003 - Revised Specs/Drawing and updated DIV 21/22 // Am-0002 - Extend proposal due date to 27 NOVEMBER 2024 // Am-0001 - Extend proposal due date to 31 OCTOBER 2024 // The F. E. Warren Geothermal Generation Project is a comprehensive initiative aimed at exploring and characterizing the presence and productivity of geothermal resources at F. E. Warren AFB, east of Cheyenne, Wyoming. The project involves drilling a geothermal well to measure the thickness and test the properties of the Hartville Formation and the underlying formations, such as the Guernsey, Flathead, and Pre-Cambrian Formations. The drilling is planned to reach a maximum measured depth of 14,000 feet. The conceptual design of the well aims to comprehensively measure the temperature, pressure, and productivity of the formations, with a particular focus on the Hartville Formation.