Geothermal Program Coso Steam Flow Verification
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Steam Tracer Mass Flow Rate Measurements will provide independent verification of steam flow rates
for steam quantities transferred between the projects Coso. The Contractor shall collect steam flow
samples at the Coso geothermal sites defined in the following section and run the analysis for each
sample collected at the Contractor’s laboratory. Once the analysis is completed , the results will be sent
to GPO.
The contract term will be for a base period of one year, starting in 2026, plus four option years; only the base period of the contract will offer a minimum guarantee. Additionally, if the Government does not award a follow-on contract in time, the Government may require the Contractor to continue performance for an additional period up to six months under the Option to Extend Services clause.