GMF FR42C Road Reconstruction

SOL #: 12445526Q0052Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

VT

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 7, 2026
2
Last Updated
Apr 24, 2026
3
Submission Deadline
Apr 30, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotations for GMF FR42C Road Reconstruction on the Green Mountain National Forest in Vermont. This project supports the Falls Brook Timber Sale and involves comprehensive road reconstruction activities. This is a Total Small Business Set-Aside. Quotations are due April 30, 2026, by 2:00 P.M. Eastern.

Scope of Work

The project entails the reconstruction of Forest Road 42C, including, but not limited to:

  • Roadway reconstruction
  • Rock excavation (blasting is permitted)
  • Clear and grubbing
  • Bank armoring and slope stabilization (using various riprap classes)
  • Linear grading
  • Installation of drainage structures (new culverts and reconditioning existing ones)
  • Application of aggregate surface course and pit run material
  • Seeding and mulching for erosion control (referencing the Low Risk Handbook for Erosion Prevention and Sediment Control)
  • Traffic control measures

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS: 237310 (Highway, Street, and Bridge Construction) with a $45M size standard
  • PSC: Y1LB (Construction Of Highways, Roads, Streets, Bridges, And Railways)
  • Award Type: Single Firm Fixed Price Award
  • Period of Performance: 60 days from Notice to Proceed, starting after May 1, 2026
  • Estimated Magnitude: Between $100,000 and $250,000
  • Place of Performance: Forest Road 42C, Green Mountain National Forest, Rochester, VT (Windsor County)

Submission & Evaluation

  • Submission Method: Email completed bids to debra.brinn@usda.gov
  • Quotation Deadline: April 30, 2026, by 2:00 P.M. Eastern
  • Bid Bond: Required if quote exceeds $150,000 (20% of bid amount or $32,000, whichever is lower)
  • Offer Acceptance Period: 60 calendar days from receipt of offers
  • Evaluation Basis: Award will be made to the lowest priced, responsible offeror who is responsive to the solicitation, in accordance with FAR 12.204.
  • Questions Due: April 24, 2026, by 2:00 PM Eastern (RFI log posted April 23, 2026)

Additional Notes

Bidders must furnish all necessary personnel, material, equipment, services, and facilities. The project requires adherence to US Department of Transportation Federal Highway Administration Standard Specifications and Forest Service Supplemental Specifications (FSSS), which modify the FP-24 standard specifications. A Spill Prevention Plan and Spill Kit are required on site, and equipment must be cleaned to prevent the spread of invasive species. Wage Determination VT20260065 for Windsor County, Vermont, applies.

People

Points of Contact

BRINN, DEBRA KPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
View
GMF FR42C Road Reconstruction | GovScope