Government Publishing Office FM Modernization / Construction
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Government Publishing Office (GPO) has issued Amendment 0002 to the FM Modernization / Construction opportunity (040ADV-26-R-0013). This is the second and final amendment, which adds a final question and response to the Q&A document and extends the proposal due date to March 30, 2026. Bidders must review the original notice and the first amendment in conjunction with this update.
Project Scope
The original opportunity pertains to Construction of Office Buildings for GPO's Facilities Management (FM) Modernization project in Washington, DC.
Key Amendment Details
This amendment specifically:
- Updates the Q&A document with one final question and response.
- Extends the proposal submission deadline to March 30, 2026.
Major Clarifications from Q&A Document
The comprehensive Q&A document provides critical details for bidders, including:
- Manufacturer Acceptability: Substitutions for Klimak and Kruger equipment require formal review and approval.
- Vent Piping: Condensate receiver vent piping must be routed to a code-compliant atmospheric termination point, coordinated with the COR.
- Work Hours: Normal work hours are 6:00 AM – 3:00 PM EST; disruptive work may require after-hours coordination.
- HVAC Controls: No centralized DDC system; new controls must comply with project specifications.
- Fire Rating: Doors are not fire-rated unless specified; must comply with code.
- Wage Scale: Governed by the Davis Bacon Act, with the most current D.C. wage determination provided.
- Fire Alarm Systems: New work must be compatible with the existing campus system; coordination with the vendor is required.
- Key Personnel: Superintendent, SSHO, and QCM must be separate Full-Time Equivalent (FTE) positions.
- Furniture: Government will remove furniture; contractors are not responsible for moving or disposal.
- Hazardous Materials: Work must stop and COR notified if encountered; asbestos warning stickers do not imply abatement in base scope.
- Parking: Onsite parking is available at Lot 50 for $9/day, contractor responsible for cost.
- Access: Via designated loading dock and approved service routes; coordination with Facilities Management required.
- Bid Bond: Required, at least 20% but not to exceed $3M.
Contract & Timeline
- Opportunity Type: Special Notice (Amendment)
- Product Service Code: Y1AA (Construction Of Office Buildings)
- Set-Aside: None specified
- New Proposal Due Date: March 30, 2026, 5:00 PM EST
- Published Date: March 18, 2026
- Agency: Government Publishing Office, Acquisition Services
Action Items
Bidders should thoroughly review all provided documents, including the original notice, the first amendment, and the updated Q&A, to ensure their proposals align with the clarified requirements and the extended deadline.