GPO G-Street Sidewalk Repair

SOL #: 040ADV-26-R-0010-001Special Notice

Overview

Buyer

Government Publishing Office
United States Government Publishing Office
Acquisition Services
Washington, DC, 20401, United States

Place of Performance

DC

NAICS

Poured Concrete Foundation and Structure Contractors (238110)

PSC

Maintenance Of Other Administrative Facilities And Service Buildings (Z1AZ)

Set Aside

No set aside specified

Timeline

1
Posted
Jun 16, 2026
2
Action Date
Jul 6, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

Amendment 001 to Solicitation 040ADV-26-R-0010 for the GPO G-Street Sidewalk Repair project has been issued by the Government Publishing Office. This amendment provides answers to vendor questions asked after the site visit and includes a list of attendees. The project involves maintenance of other administrative facilities and service buildings. Proposals are due by July 6, 2026.

Scope of Change

This amendment primarily addresses vendor inquiries and clarifies project specifics. Key updates include:

  • Q&A Responses: Comprehensive answers to questions submitted during the Q&A timeframe.
  • Site Visit Attendees: A list of vendors who attended the site visit on May 29, 2026, including companies such as Restoration East, Terra Constructs, and American Restoration.

Major Clarifications from Q&A

  • Work Hours: Normal work hours are Monday-Friday, 6:00 AM – 3:00 PM. Noisy work requires coordination with the GPO COR for potential off-hours or phased work.
  • Notice to Proceed: Anticipated at contract award, with contractors planning for a 180-calendar-day construction duration.
  • Phasing: Work will be phased and coordinated with GPO operations. Staging outside work areas requires GPO approval. Access to building entrances must be maintained, though the G Street Entrance will be closed during construction in that area, requiring temporary pedestrian routing.
  • Drawings & Materials: Refer to Civil Drawings C001–C010, which are part of the bid package. Existing granite curbs and gutters are to be removed and reinstalled as necessary, with salvageable materials reused. Shop drawings for aluminum railings must be signed and sealed by a Professional Engineer.
  • Demolition & Abatement: Existing sheet metal ductwork conflicting with sidewalk/structural repairs is included in the demolition scope. No known asbestos-containing materials (ACM) are identified; however, procedures for suspected ACM are outlined, requiring immediate work stoppage and GPO notification.

Contract & Timeline

  • Opportunity Type: Special Notice (Amendment to Solicitation 040ADV-26-R-0010)
  • Product Service Code: Z1AZ (Maintenance Of Other Administrative Facilities And Service Buildings)
  • Place of Performance: Washington, DC 20401, United States
  • Response Due: July 6, 2026, 05:00 PM ET
  • Published: June 16, 2026 (Amendment posted June 17, 2026)
  • Set-Aside: None specified

Additional Notes

This amendment provides crucial details for accurate proposal preparation and planning. Offerors should thoroughly review the Q&A and site visit attendance list for any potential impact on their proposals.

People

Points of Contact

Troy D. WhitePRIMARY
Gary StevensSECONDARY

Files

Files

Download
Download
Download

Versions

Version 1Viewing
Special Notice
Posted: Jun 16, 2026
GPO G-Street Sidewalk Repair | GovScope