Greenhouse Roof Replacement and Rail Replacement

SOL #: 1232SA26Q0438Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Agricultural Research Service
USDA ARS AFM APD
BELTSVILLE, MD, 20705, United States

Place of Performance

Schriever, LA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 8, 2026
2
Last Updated
May 12, 2026
3
Submission Deadline
May 8, 2026, 11:30 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Agricultural Research Service (ARS) is soliciting proposals for a Greenhouse Roof Replacement and Rail Replacement project at its Sugarcane Research Site in Schriever, LA (Houma, LA). This is a Combined Synopsis/Solicitation for a Firm Fixed-Price contract. The opportunity is a Total Small Business Set-Aside. Proposals are due by May 8, 2026, at 11:30 AM Z.

Scope of Work

The project involves two distinct phases:

  • Greenhouse Roof Replacement (Scope A): This phase requires replacing existing 16mm double-skinned acrylic roof panels with new impact-modified acrylic panels, including disposal of old materials and cleaning of metal frames. The scope also includes repairing and adjusting damaged ridge vents to ensure a water-tight roof, with a required one-year installation warranty. This is considered an emergency repair and should be completed as soon as possible.
  • Photoperiod Rail Replacement (Scope B): This phase entails removing and replacing existing steel rails for twelve sugarcane carts. The new system will utilize continuous Fiberglass Reinforced Polymer (FRP) extrusions, grouted with 9000 PSI non-shrink epoxy. Specific FRP profiles and materials are detailed in attachments, with a requirement for polyester resin FRP. This work is scheduled for the winter months, from December 2026 to March 2027.

Key Clarifications from RFI Responses:

  • Alternate rail materials (e.g., Stainless Steel) will not be accepted due to the corrosive environment.
  • The Period of Performance will be adjusted to accommodate a 6-week lead time for roof panels.
  • A single individual can fulfill Superintendent, Quality Control Manager, and SSHO roles, but a second qualified SSHO is required for work at heights of 15 feet or more or when crossing the greenhouse floor.

Contract Details

This will be a Firm Fixed-Price contract with a total Period of Performance of 10 months, broken into the two distinct phases. Davis-Bacon wages apply, and bidders must account for these prevailing wage rates. Bid bonds, bid guarantees, and construction payment and performance bonds are required.

Submission & Evaluation

Award will be made to the Lowest Priced Technically Acceptable (LPTA) offeror. Proposals must be emailed to david.reynolds2@usda.gov. Offerors must provide at least two recent (within 5 years) and relevant references for similar greenhouse renovation projects. Offers must remain valid for 90 calendar days. Prospective offerors must be registered in the System for Award Management (SAM) at the time of solicitation closing.

Important Notes

Amendment 0001, posted on April 29, 2026, provides responses to Requests for Information (RFIs) generated from the site visit. Offerors must acknowledge receipt of this amendment prior to the specified deadline. The primary point of contact is David Reynolds at david.reynolds2@usda.gov.

People

Points of Contact

David ReynoldsPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: May 12, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View