Greenhouse Siding Repairs
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of Agriculture (USDA) Agricultural Research Service (ARS) is seeking quotations for Greenhouse Siding Repairs at its facility in Brookings, South Dakota. This is a Total Small Business Set-Aside acquisition issued as a Request for Quotation (RFQ). The project involves removing existing exterior covering and installing new steel siding on two greenhouses. Proposals are due by June 12, 2026, at 10:00 am CDT.
Scope of Work
The primary objective is to remove existing stucco, foam, and wire mesh from the lower concrete walls of Greenhouses 07 and 17 (approximately 460 linear feet by 3 feet high per greenhouse) and replace them with new commercial-grade steel siding (minimum 26 gauge, "light stone" color). The scope also includes:
- Disposal or recycling of removed materials.
- Replacement of approximately 150 linear feet of 1.5-inch PVC drainage ports.
- Re-attachment of two existing lightning rod cables.
- Ensuring accessibility of one water spigot per greenhouse.
- Installation of pressure-treated backing, 5-inch steel flashing, and J-channel.
Contract & Timeline
- Contract Type: Firm-Fixed Price Order (RFQ)
- Set-Aside: Total Small Business Set-Aside (NAICS 236220, $45.0 million size standard)
- Period of Performance: Work must be completed within 90 calendar days of the Notice to Proceed. Deliverables are due 300 days or earlier after contract acceptance (SOW states 300 days, Solicitation states 90 days from NTP; 90 days from NTP is more specific for completion).
- Estimated Magnitude: Less than $25,000.
- Published Date: May 19, 2026
- Response Due Date: June 12, 2026, by 10:00 am CDT
Submission & Evaluation
This acquisition will utilize a Lowest Priced Technically Acceptable (LPTA) source selection process. Award will be made to the responsible offeror with the lowest price that is technically acceptable. Key requirements for submission and evaluation include:
- Mandatory Site Visit: Wednesday, June 3, 2026, at 8:00 am CDT at the USDA Integrated Cropping Systems Research Center, Brookings, SD. Registration deadline is June 2, 2026, by 3:00 pm CDT. Failure to attend and sign in will result in an unacceptable rating.
- Questions Due: Thursday, June 4, 2026, by 10:00 am CDT via email to frank.palmer@usda.gov.
- Proposal Validity: Offers must remain valid for 90 calendar days (Solicitation) or 45 calendar days (SF1442) after the due date. Bidders should plan for 90 days.
- Technical Acceptability Factors: Site visit attendance, completion of SF 1442 and SF30 forms, submission of a Bid Bond (SF 24 or equivalent), documented experience with two recent relevant references, and past performance (CPARS). A performance and payment bond is mandatory.
Additional Notes
All personnel must have a U.S. photo ID. An on-site superintendent is required. Attachment 3 provides Wage Rates from the U.S. Department of Labor, which are crucial for estimating labor costs and ensuring compliance.