Ground Penetrating Radar Unit
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting for a Ground Penetrating Radar (GPR) Unit and associated services for the Maintenance Support Group (MXSG) at Robins Air Force Base, Georgia. While the notice indicates an anticipated sole-source award to GeoPhysical Survey Systems, Inc., this is a solicitation for an UNRESTRICTED acquisition. Offers are due June 19, 2026, at 1:00 PM local time.
Scope of Work
The contractor shall provide all necessary tools, parts, materials, equipment, labor, transportation, training, and installation for one (1) GPR system. This includes operational training for the system after installation.
Contract Details
- Contract Type: Firm Fixed Price
- Set-Aside: UNRESTRICTED
- NAICS Code: 334511 (Drafting, Surveying, And Mapping Instruments)
- Place of Performance: Warner Robins, GA
- Period of Performance: Delivery and installation required within 45 calendar days from contract award.
Key Requirements & Deliverables
- System Compliance: The GPR system must comply with the "Purchase Description" dated April 9, 2026, and the "Ground Penetrating Radar Unit" specification dated January 8, 2026.
- Environmental & Safety:
- No Class I Ozone Depleting Substances (ODS) to be used.
- Adherence to "Health and Safety on Government Installations" requirements.
- Mandatory Cybersecurity Maturity Model Certification (CMMC) Level Requirements.
- Appendix C: Requires a comprehensive Contractor Safety and Health Plan addressing OSHA, federal/state/local laws, mishap notification, and specific safety areas (e.g., FOD, fall protection, hazardous materials). This plan must be submitted and accepted prior to work commencement.
- Contract Data Requirements Lists (CDRLs):
- A001 (Status Report / EMS Training): All personnel must complete Air Force-provided Environmental Management Systems (EMS) Awareness Training before working on Robins AFB.
- A002 (Status Report / EnMS Training): All personnel must complete initial Energy Management System (EnMS) training due to WR-ALC's ISO 500001 certification. The prime contractor is responsible for ensuring all personnel, including subcontractors, complete this.
- A003 (Contractor's Safety Plan): A draft plan is due within 10 working days post-award, with the final plan due 10 working days after government acceptance of the draft.
- A004 (Accident/Incident Report): Strict reporting requirements for mishaps, including telephonic notification within 4 hours, electronic within 3 days, and a detailed report within 20 days.
Submission & Evaluation
- Offer Due Date: June 19, 2026, at 1:00 PM local time.
- Evaluation Criteria: Award will be made to the responsible offeror whose offer, conforming to the solicitation, is the lowest price.
Contact Information
- Primary: Tosha Taylor (tosha.taylor.2@us.af.mil)
- Secondary: Robert Robinson (robert.robinson.53@us.af.mil)