GROUNDS MAINTENANCE FORT STEWART/HAAF

SOL #: W9124M26RA007Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT STEWART
FORT STEWART, GA, 31314-3324, United States

Place of Performance

Fort Stewart, GA

NAICS

Landscaping Services (561730)

PSC

Landscaping/Groundskeeping Services (S208)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 4, 2026
2
Last Updated
Jun 18, 2026
3
Submission Deadline
Jun 5, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, MICC-FT STEWART, is soliciting proposals for Grounds Maintenance Services at Fort Stewart and Hunter Army Airfield, Georgia. This is a Firm Fixed-Price (FFP) contract, set aside for 100% Total Small Business concerns. The acquisition covers comprehensive grounds maintenance, including specialized care for areas like Warriors Walk. Proposals are due June 12, 2026, at 2:00 PM EST.

Scope of Work

This non-personal services contract requires the contractor to provide all personnel, equipment, supplies, and supervision for grounds maintenance. Services include:

  • Mowing, edging, trimming, and leaf/debris removal across Improved, Semi-Improved, and Unimproved Areas.
  • Specialized maintenance for Warriors Walk, including Crape Myrtle tree care (pruning twice annually) and replacement.
  • Maintenance of Airfields (Wright Army Airfield: 374 acres, Hunter Army Airfield: 506 acres, estimated 7 cuts/year) and Cemeteries (approx. 22 acres at FS, 2 acres at HAAF, 3 cuts/year with headstone trimming).
  • Weed control, irrigation system operation, and special event services.
  • Coordination with Range Control is required before entering range areas.

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP)
  • Set-Aside: 100% Total Small Business
  • NAICS Code: 561730 (Landscaping, Lawn Maintenance), $9.5M size standard
  • Period of Performance:
    • 2-month phase-in: September 1, 2026 – October 31, 2026
    • Base Period: November 1, 2026 – August 31, 2027 (10 months)
    • Four (4) 12-month option periods: September 1, 2027 – August 31, 2031
    • Potential 6-month extension.
  • Place of Performance: Fort Stewart and Hunter Army Airfield, Georgia.
  • Proposal Due Date: June 12, 2026, at 2:00 PM EST.
  • Published Date: June 2, 2026 (latest amendment).

Submission & Evaluation

  • Submission: Proposals must be submitted electronically via email to both the Contracting Officer, Lacey Turner (lacey.m.turner2.civ@army.mil), and Contract Specialist, Cosmin Popa (cosmin.popa.civ@army.mil). Disregard PIEE submission guidance.
  • Evaluation: Award will be made to the Lowest-Priced Technically Acceptable (LPTA) offeror. Evaluation factors include:
    • Technical Capability: Clear, feasible approach, staffing, management, phase-in plan, Georgia herbicide certification, landscape experience, and memorial/cemetery maintenance experience. State licenses/certifications and 3-year corporate/personnel experience are excluded from the 10-page limit for Volume II.
    • Past Performance: Recency and relevancy, requiring at least 3,000 acres of grounds maintenance experience.
    • Price: Reasonableness.
  • Eligibility: Offerors must be registered in SAM.gov. Multiple Service Contract Act Wage Determinations apply.

Additional Notes

Bidders must acknowledge all solicitation amendments. Required deliverables include a phase-in plan, Safety Plan, Spill Plan, Key Personnel Roster, and proof of required insurance. Contractor storage site policies and access control card requests are detailed in attachments.

People

Points of Contact

Lacey TurnerPRIMARY
Cosmin PopaSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Jun 18, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jun 4, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Jun 2, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Jun 1, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 13, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 4, 2026
View