Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (FY26)

SOL #: W911QY-26-R-GROUNDWATERCombined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-APG NATICK
NATICK, MA, 01760-5011, United States

Place of Performance

Natick, MA

NAICS

Remediation Services (562910)

PSC

Hazardous Substance Removal, Cleanup, And Disposal Services And Operational Support (F108)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Jan 16, 2026
2
Last Updated
Feb 5, 2026
3
Submission Deadline
Jan 30, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Contracting Command - Aberdeen Proving Ground (ACC-APG), Natick Division, is soliciting proposals for environmental remediation services for groundwater pump and treatment system operation and semi-annual groundwater monitoring at the U.S. Army Natick Soldier Systems Center (NSSC) in Natick, MA. This opportunity is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Proposals are due by January 30, 2026, at 12:00 PM ET.

Scope of Work

The contractor will provide all necessary personnel, equipment, supplies, and non-personal services for environmental remediation at three sites: NRDEC-05, NRDEC-11, and NRDEC-16. Services encompass a wide range of activities, including site investigation, remedial design, remedial construction, remediation operations, and long-term management, all consistent with the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). The primary goal is to address groundwater contamination, specifically Trichloroethylene (TCE) and Tetrachloroethylene (PCE). Key deliverables include a Project Management Plan (PMP), Quality Control Plan (QCP), Health and Safety Plan (HASP), Quality Assurance Project Plan (QAPP), and an Optimization Plan.

Contract Details

  • Type: Single, Firm-Fixed-Price (FFP) contract.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) (FAR Part 13).
  • NAICS: 562910, Remediation Services, with a $25M size standard.
  • Period of Performance: Five years, consisting of one base period and four option periods.
  • Place of Performance: U.S. Army Soldier Systems Center, Natick, MA.
  • Key Personnel: Requirements include a Project Manager, Senior Scientist/Engineer, Quality Assurance Manager, Quality Control Manager, and Wastewater Treatment Plant Operator.
  • SAM Registration: Contractors must be registered in the System for Award Management (SAM) to be eligible for award.

Submission & Evaluation

  • Proposals Due: January 30, 2026, by 12:00 PM ET.
  • Submission: Offers must be emailed to Contract Specialist Chris Welsh (richard.c.welsh2.civ@army.mil) and Contracting Officer Alejandro Ayala (alejandro.ayala.civ@army.mil).
  • Evaluation Factors: Award will be based on a Best Value tradeoff, considering Technical Capability, Past Performance, and Price. Technical Capability is significantly more important than Past Performance, which is more important than Price.
  • Proposal Structure: Proposals should include Volume I (Mission Capability), Volume II (Past Performance, with up to three examples of optimization or CERCLA-related projects within the last five years), and Volume III (Price, utilizing the provided CLIN Structure, Attachment #2).

People

Points of Contact

Alejandro AyalaSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Feb 5, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Feb 5, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Jan 29, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Jan 26, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Jan 22, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 16, 2026
View
Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (FY26) | GovScope