GSU Transformer Supply, Oahe Dam, SD & Ft Peck Dam, MT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, specifically W071 ENDIST OMAHA, has issued an Award Notice for the supply of Generator Step-Up (GSU) Transformers for Oahe Dam, SD and Fort Peck Dam, MT. This contract covers the design, manufacturing, and delivery of these critical components.
Scope of Work
This award covers the supply of GSU transformers, which includes:
- Fort Peck Dam: Design and manufacturing of two new GSU transformers (4 and 5) for switchyard #2.
- Oahe Dam: Design and manufacturing of ten new GSU transformers.
For both locations, the scope also includes the design and manufacturing of ancillary and control components, performance of Factory Acceptance Testing (FAT), delivery to the power plants, offloading, reassembly, oil processing and filling, and movement to the final operating location. Installation and final acceptance testing/commissioning after interconnection will be performed by a separate contractor.
Contract & Timeline
- Type: Supply Contract (Award Notice)
- Product/Service Code: 6120 - Transformers: Distribution And Power Station
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Award Date: February 20, 2026
- Place of Performance: Fort Pierre, SD (Oahe Dam) and Fort Peck, MT (Fort Peck Dam)
Contact Information
- Primary: Brandie Murphy (Brandie.L.Stallsworth@usace.army.mil)
- Secondary: Marc Proietto (marc.proietto@usace.army.mil)