Guardrail Installation, Pease ANGB
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The New Hampshire Air National Guard (157th ARW) is conducting a Sources Sought to identify qualified Small Business concerns for Guardrail Installation at Pease Air National Guard Base (ANGB) in Newington, NH. This market research aims to determine the availability of contractors capable of installing an M30 P1 rated cable barrier system. Responses are due by April 13, 2026.
Scope of Work
The project involves installing approximately 820 linear feet of an M30 P1 rated cable barrier system along primary roadways leading into the main post area of Pease AFB. The scope includes all necessary management, labor, materials, and equipment for site preparation, excavation, foundation construction, barrier installation, and site restoration.
Contract & Timeline
- Type: Sources Sought / Market Research
- NAICS: 237310 – Highway, Street, and Bridge Construction (Size Standard: $45.0M)
- Magnitude: Between $100,000 and $250,000 (FAR 36.204(c))
- Set-Aside: Intended for Small Business concerns; market research to confirm availability. If adequate small businesses are not available, it may be advertised as unrestricted.
- Response Due: April 13, 2026, 4:00 PM EST
- Published: April 2, 2026
Submission Requirements
Interested prime contractors must submit a written response (maximum 10 single-sided pages) via email, including:
- A positive statement of intent to bid as a prime contractor.
- A completed and signed Sources Sought Response Form (attached).
- A listing of projects completed in the past three years (Government/private, type, dollar value, contract number, location, POC, prime/sub status).
- A brief outline of resources, subcontractors, and key personnel.
- A letter from your surety detailing maximum bonding capacity per project. The attached form specifies a bonding capability of at least $5M for individual construction projects.
Additional Notes
This is for planning purposes only and is not a solicitation. Responses are not considered offers. Email submissions should use the subject line: "W50S8A-26-B-A004, Sources Sought". Contact Casey Pridham (casey.a.pridham.mil@army.mil) or Matthew Lapointe (matthew.r.lapointe.civ@army.mil) for inquiries.