GUN,SEALANT,20 OUNC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT MECH has issued a Solicitation for the manufacture of "GUN,SEALANT,20 OUNC" (part number 6237090-001, CAGE 53711). This opportunity is a Total Small Business Set-Aside. Key requirements include adherence to specific drawings, Government Source Inspection, and a 90-day delivery period. Proposals are due March 30, 2026.
Scope of Work
This contract requires the manufacture of the specified sealant gun, including all parts listed on the drawing. Manufacturing and design must meet material and physical requirements as specified, particularly for part number 6237090-001, CAGE 53711. Marking must comply with applicable Military Standards such as MIL-STD-130, MIL-STD-1285, MIL-STD-454, and MIL-P-15024/5. Configuration control is governed by MIL-STD-973. The contractor is responsible for all shipping expenses to specified DODAAC locations.
Contract & Timeline
- Type: Solicitation
- Set-Aside: Total Small Business
- Product Service Code: 5130 (Hand Tools, Power Driven)
- Proposal Due: March 30, 2026, 8:30 PM ET
- Published: January 07, 2026
- Delivery: 90 days after contract award.
Quality Assurance & Inspection
Government Source Inspection per FAR 52.246-2 is required. The contractor is primarily responsible for all inspection requirements, though the Government reserves the right to conduct its own inspections. Records of all inspection work must be maintained for 365 calendar days post-delivery.
Additional Notes
Drawings are critical for this procurement and take precedence in case of conflict with contract text. They can be viewed and downloaded from SAM.gov by searching the solicitation number. Packaging must adhere to MIL-STD 2073. This is not an FMS requirement. For inquiries, contact Amanda R. Hayward.