H159--VANIHCS 3 Year Electrical Testing Marion and Fort Wayne
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Clean, test, adjust, calibrate, inspect and retorque all the below mentioned electrical distribution apparatus. This shall include, but not be limited to, power transformers, switchgear, motor control centers, distribution centers, panel boards, air circuit breaker, vacuum circuit breakers, and loop switches listed in Attachment I SOW Attachments. Over-current testing apparatus shall be limited to over-current relays for each 15 KV and 5 KV circuit breaker. Megger voltage shall not exceed IEEE standards. No high pot voltage to be applied to feeder wires. All equipment will be isolated from panel and feeders during testing for proper data reading. No variance.
Contractor is responsible to reinstall equipment to original condition, verifying voltage, phasing and rotation. Any damage to equipment due to contractor neglect is the contractor s financial responsibility.
Repairs outside this SOW will be at an additional charge to the VA and require prior approval from the COR and Contracting Officer before repairs are started.