H2F Gym and Fitness Equipment for Camp Casey, Korea
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army is soliciting quotations for H2F Gym and Fitness Equipment including flooring installation for Camp Casey, South Korea. This procurement supports the 2ID Soldier fitness and readiness program. The government intends to award a Firm Fixed-Price contract based on Best Value. Quotes are due May 29, 2026, at 5:00 PM Korean local time.
Scope of Work
The contractor shall provide all labor, tools, equipment, and supplies to deliver and install gym equipment and flooring at Camp Casey. The requirement includes a wide range of fitness equipment such as barbells, dumbbells, kettlebells, medicine balls, sandbags, treadmills, rowing machines, and artificial turf flooring, as detailed in the attached Pricing Sheet. Installation of the flooring is a mandatory component of this purchase order.
Contract Details
- Contract Type: Firm Fixed-Price
- Set-Aside: Unrestricted
- NAICS Code: 339920 (Recreational And Gymnastic Equipment)
- Size Standard: $1.5 million
- Place of Performance: Camp Casey, South Korea
- Delivery: Required No-Later-Than (NLT) 30 Days After Receipt of Order. Vendors are encouraged to propose their most aggressive delivery schedule.
Submission & Evaluation
- Quote Due Date: May 29, 2026, 5:00 PM Korean local time.
- Question Submission Deadline: May 26, 2026, 5:00 PM Korean local time.
- Submission Method: Via PIEE website (https://www.piee.eb.mil). If PIEE is unavailable, submit via email to specified contacts.
- Evaluation Factors:
- Technical Specification: Evaluated as 'Acceptable' or 'Unacceptable'. Quotes deemed Unacceptable will not be considered.
- Price: Evaluated for completeness and reasonableness, including all shipping/FOB Destination charges.
- Delivery Schedule: Evaluated favorably for proposals offering earlier delivery than the NLT date.
- Relative Importance: Technical Specification is evaluated first. Among technically Acceptable quotes, Delivery Schedule is equal in importance to Price.
- Basis of Award: Best Value to the Government. The Government may select a higher-priced quotation if an accelerated delivery schedule justifies the additional cost. Award may be made without exchanges.
Key Requirements for Submission
Quotes must include:
- Completed Pricing Sheet (Excel file) with unit and total prices for all items and flooring installation.
- Pictures of the exact make and model offered.
- Technical data for proposed equipment.
- Cage Code and UEI number.
- Proposed delivery timeline.
Contact Information
For inquiries, contact Sung Yong Yi at sungyong.yi.ln@army.mil or 05033553371.