Hanel Lean Vertical Lift Module (VLM) Maintenance - FT BRAGG

SOL #: PANMCC-26-P-0000-033907Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC FDO FT BRAGG
FORT BRAGG, NC, 28310-0000, United States

Place of Performance

Fort Bragg, NC

NAICS

Conveyor and Conveying Equipment Manufacturing (333922)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Service And Trade Equipment (J035)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 3, 2026
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 12, 2026, 1:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, MICC FDO FT BRAGG, is soliciting quotes for Hanel Lean Vertical Lift Module (VLM) Maintenance Services at the Joint Armament Facility, Fort Bragg, North Carolina. This is a Total Small Business Set-Aside for a follow-on contract to ensure the safety, functionality, calibration, and reliability of VLMs. Quotes are due by March 12, 2026, at 9:00 a.m. EST.

Scope of Work

The contractor will provide repairs and maintenance for Hanel Lean VLMs, starting with 12 units in the base year and increasing to 18 in subsequent option years. Services include performing quarterly inspections, documenting structural deficiencies, acquiring technical and service data from Hanel Lean USA, updating service manuals, and providing necessary personnel, equipment, and supplies. The scope also covers ordering replacement components, service kits, and individual parts, with a plug figure of $45,000 per Period of Performance for parts.

Performance Standards

Key performance metrics include a response time of 24 to 48 business hours for repairs, semi-annual Preventive Maintenance Service, and thorough inspections. Quarterly inspection results must be provided to the KO/COR within 30 calendar days. Contractors must notify the KO/COR within 48 hours of discovering any deficiency and begin the repair process within 96 hours. Compliance with relocation and initial delivery will be tallied for CPAR reporting.

Contract Details

This is a Firm Fixed Price contract with one twelve-month base period (April 1, 2026 - March 31, 2027) and four twelve-month option periods, extending the potential performance through March 31, 2031. The NAICS code is 333922, "Conveyor and Conveying Equipment Manufacturing," with a 500-employee small business size standard.

Special Requirements

Contractor personnel must be Hanel Lean certified, U.S. citizens (unless approved), proficient in English, and maintain high standards of professionalism. They must adhere to security requirements, including physical security and OPSEC, and complete required training (e.g., AT Level I, Threat Awareness). A Quality Control Plan (QCP) is required within 30 days of award, and a signed non-disclosure agreement (NDA) must be provided to the COR 5 days prior to work commencement.

Submission & Evaluation

Quotes are due via email to claribel.ordaz-rios.civ@army.mil and amanda.l.foster22.civ@army.mil by March 12, 2026, at 9:00 a.m. Eastern Standard Time. Evaluation will consider technical capability, past performance, and price, with technical and past performance being significantly more important than price. Required documents include a technical approach, pricing for all CLINs, and a completed FAR 52.212-3.

Additional Notes

This solicitation is Amendment 1 to the original RFQ, which removed draft documents, updated Provision 52.212-2, and released Q&As. This is a follow-on contract, with the previous contract number being W91247-20-P-0153.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 3, 2026
View
Hanel Lean Vertical Lift Module (VLM) Maintenance - FT BRAGG | GovScope