Harry S Truman Streetscape Perimeter Construction Project
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The General Services Administration (GSA), Public Buildings Service (PBS) New England Region, is seeking a construction contractor for the Harry S Truman Streetscape Perimeter Construction Project in Washington D.C. This Firm Fixed-Price solicitation aims to enhance security and aesthetics around the HST building. Proposals are due July 22, 2026.
Project Overview
This project originated in response to the events of 9/11, aiming to replace temporary security measures with permanent, tested countermeasures. The scope involves civil/site construction of approximately 162,000 square feet of streetscape, including sidewalks, curb & gutter, and utilities, to be completed in four phases. The goal is to secure the building, protect employees and visitors, and create an attractive, accessible environment.
Key Requirements & Deliverables
The project includes:
- Construction services for roadwork, sidewalks, and traffic control.
- Work within a fully occupied complex facility.
- Security perimeter upgrades, including bollards and integration with building automated systems.
- Base Bid: Phase 1 Construction, Landscaping, and Hazardous Material Abatement.
- Optional Phases: Construction services for Phases 2, 3, and 4.
- Coordination of utility relocations (e.g., Pepco, Federal Reserve Board conduit) in Phase 2.
- All services require provision of labor, material, equipment, testing, and supervision.
Contract Details
- Contract Type: Firm Fixed-Price.
- Estimated Price Range: More than $10,000,000.
- Period of Performance: Substantial Completion within 760 calendar days of Notice to Proceed (NTP), with Contract Completion 60 days thereafter. Earliest start 11/02/2026, latest end 10/24/2028.
- Liquidated Damages: $3,529.00 per calendar day for failure to achieve Substantial Completion.
Eligibility & Submission
- Set-Aside: None specified. However, a Small Business Subcontracting Plan is required for "other than small businesses."
- Eligibility: Offerors must have an "Active" SAM registration status.
- Proposal Submission Deadline: July 22, 2026, by 12:00 PM EST.
- Submission Method: Electronic via email to Molly.Lewis@gsa.gov and Emily.Jackson@gsa.gov. Emails with attachments 25MB or larger, or non-PDF attachments, may be rejected.
- Required Documents: SF 1442, Bid Pricing Excel Document, GSA Form 527 (Contractor's Qualifications and Financial Information), Past Performance Questionnaire, and a Proprietary Information Agreement (NDA). A Bid Guarantee (20% of bid price or $3,000,000, whichever is less) is also required.
Evaluation Factors
Proposals will be evaluated based on:
- Past Experience on Relevant Projects (40%)
- Past Performance on Relevant Projects (30%)
- Site Specific Project Management Plan (30%) Non-price factors combined are significantly more important than the Total Evaluated Price.
Key Dates & Contacts
- Pre-Proposal Conference: June 09, 2026, 9:00 am EST (Virtual).
- Site Visit: June 10, 2026, 9:00 am EST and 1:00 pm EST. Registration required by June 02, 2026.
- Primary Contact: Molly Lewis (molly.lewis@gsa.gov).