Hawthorne Army Depot New Bomb Request for Information

SOL #: W519TC-25-I-HWADSpecial Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

NV

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Architect And Engineering Construction: Other Non Building Facilities (C1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 18, 2025
2
Action Date
Oct 13, 2025, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The Army Contracting Command - Rock Island, on behalf of Headquarters, Joint Munitions Command is issuing a request for information notice to identify capable sources for two stormwater detention pond projects at Hawthorne Army Depot (HWAD) in Hawthorne, NV. The first project includes clean-up/rehabilitation of the stormwater dry detention ponds. The second project includes design and construction of stormwater detention ponds.

REQUIREMENT DESCRIPTION: Project one requires rehabilitation of storm water controls at the New Bomb open burn/open detonation demilitarization site. The requirement will include clearance of material from storm water detention ponds resulting from a flood event in accordance with the attached statement of work titled New Bomb Stormwater Detention Basins and Channel Clean-Up SOW. The potential for unexploded ordnance exists and must be considered in the cleanup of collected silt in stormwater detention ponds and spillways.

Project two requires the design and construction of storm water controls capable of withstanding a 500-year flood event and contain a 100-year event in accordance with the attached statement of work titled New Bomb Design and Build SOW.

The intent is for project one and the design part of project two to be completed concurrently with the construction part of project two to begin immediately after to avoid double movement of material and equipment as much as possible. Nearby storage location for transient materials is available, and aggregate can be stored on site for later reuse in construction of ponds and spillways.

RESPONSES: Interested vendors are invited to indicate their interest by providing the U.S. Government with the following information no later than 0900 central on 14 October 2025:

  1. Provide a brief summary of the company’s capabilities (a description of the facilities, equipment, personnel experience, quality system, and past/current relevant experience). Any potential key subcontractors shall also be addressed, by indicating which key tasks or processes would be subcontracted and provide a brief summary of potential key subcontractors.
  2. Discuss the feasibility of the period of performance for tasks in each SOW. Does the contractor have the ability to accelerate the timeline? Can they be accelerated? Can any of this work be completed concurrently to create timeline efficiencies?
  3. Provide a Rough Order of Magnitude for each SOW. List all assumptions and basis of estimate.
  4. Discuss the advantages/disadvantages to the U.S. Government regarding the award of these two projects together to one contractor versus competing them separately.
  5. Discuss preferred contract type to include advantages to the U.S. Government and mitigation of risk.

This  request for information post is for information and planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the U.S. Government. The U.S. Government does not intend to award a contract on the basis of this request for information post or otherwise pay for information received.

Industry responses to this request for information post will not represent binding offers, and the U.S. Government cannot accept an industry response to form a binding contract. The U.S. Government intends to use any information submitted in response to this request to determine a path forward for meeting the described requirements.

In order to be eligible for contracts with the U.S. Government, Contractors must be registered in the System for Award Management (SAM) database prior to award, during performance, and through final payment of any contract resulting from a planned solicitation for these items. Contractors may obtain information on SAM registration by visiting: https://www.acquistion.gov. All interested companies are highly encouraged to get registered in SAM immediately.

The U.S. Government will hold all information submitted in a confidential status. Response to this request for information shall be provided via email to John Fotos at john.g.fotos.civ@army.mil and Ashley Korves at ashley.m.korves.civ@army.mil. Submit questions to contact Contract Specialist, Ashley Korves, via email at ashley.m.korves.civ@army.mil.

ATTACHMENTS:

  • New Bomb Stormwater Detention Basins and Channel Clean-Up SOW
  • HWAD Maps of Clearance Areas
  • New Bomb Design and Build SOW
  • HWAD NEW BOMB Drainage Improvements Project- Geotechnical Investigation Report
  • HWAD-NewBomb - ExistingHydroBase - 070224-ExHydroSoilsGroups
  • HWAD-NewBomb - ExistingHydroBase - 070224-Hydrology BasinsControlPoints

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Special Notice
Posted: Sep 18, 2025
Hawthorne Army Depot New Bomb Request for Information | GovScope