HBRR Common Guide (Design, manufacturing, and shipping)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
Oak Ridge National Laboratory (ORNL), managed by UT-Battelle, LLC, is soliciting proposals for the design, manufacturing, and shipping of High Flux Isotope Reactor (HFIR) Common Guides. This procurement, identified as a Solicitation, aims to secure a contractor for the HBRR (Beryllium Reflector Replacement) project. The effort includes the design, fabrication, and shipping of new neutron guides for the Cold Guide Hall, with an optional installation phase. Proposals are due by March 31, 2026.
Scope of Work
The project is divided into four phases:
- Phase 1: Design – Develop a final design for the neutron guide system, including conceptual and preliminary drawings, detailed specifications, and a test plan.
- Phase 2: Fabrication – Manufacture all guides according to the approved design, ensuring quality assurance, dimensional compliance, and surface compatibility, with component testing.
- Phase 3: Shipping – Package and ship the fabricated guides to Oak Ridge National Laboratory, Tennessee.
- Phase 4: Installation (Optional) – Provide oversight or actual installation work, requiring a separate quote.
The scope covers guides within the HB-4 Tunnel, Transition Building, and Cold Guide Hall, including multiplex and single instrument guides. Performance standards include specific neutron reflectivity parameters (QoNi, m-value, R(Q), Ro), a nominal operational lifetime of 20 years, vacuum operation within chambers, and strict tolerances for profile and angular misalignment.
Contract & Timeline
- Contract Type: Firm Fixed Price
- Anticipated Period of Performance: May 25, 2026 - September 30, 2028
- Set-Aside: None (NAICS Code: 332710 - Machine Shops)
- Proposals Due: March 31, 2026
- Questions Due: March 23, 2026
- Published Date: March 2, 2026
- Place of Performance: Oak Ridge, TN
Evaluation
Award will be made to the responsible offeror providing the best value, considering technical merit and cost/price. Evaluation factors, in descending order of importance, are:
- Manufacturing / Fabrication Plan and Schedule
- Technical and Project Management Capabilities
- Experience / Past Performance
- QA Program
Additional Notes
The Request for Proposal (RFP) includes several attachments: Statement of Work (SOW), Drawing GHS-M-00-U-0005_REV 0, ORNL Terms and Conditions, Prime Contract Flow Downs, Representations and Certifications, and Limited Rights Data. Offerors are encouraged to propose alternatives that may offer value. Site visits are not explicitly mentioned but are advised to ascertain local conditions. Payment terms are Net 30 for Large Businesses and Net 15 for Small Businesses via electronic funds transfer.