Heated (45 °C) Absolute Baratron® Capacitance Manometer, Power supply & Readouts, Cables, Mass Flow controller.

SOL #: RFQ450899Combined Synopsis/Solicitation

Overview

Buyer

Energy
Energy, Department Of
ORNL UT-BATTELLE LLC-DOE CONTRACTOR
Oak Ridge, TN, 37831, United States

Place of Performance

Oak Ridge, TN

NAICS

Instruments and Related Products Manufacturing for Measuring (334513)

PSC

Analysis Instruments, Medical Laboratory Use (6632)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 20, 2026
2
Submission Deadline
Mar 26, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Energy, specifically the NUCLEAR NONPROLIFERATION DIVISION at Oak Ridge National Laboratory (ORNL), is seeking a Heated (45°C) Absolute Baratron® Capacitance Manometer and associated accessories. This is a Combined Synopsis/Solicitation for the procurement of specific scientific equipment and components, with responses due by March 26, 2026, for performance at Oak Ridge, TN.

Scope of Work

This opportunity requires the provision of a Heated (45°C) Absolute Baratron® Capacitance Manometer, along with a power supply, readouts, cables, and a Mass Flow controller. The exact specifications and quantities for these items are detailed in Attachment C- RFQ 450899 Bill of Materials. Bidders are required to complete this Bill of Materials with pricing, lead times, and country of origin for each item.

Contract & Timeline

  • Opportunity Type: Combined Synopsis/Solicitation (RFQ)
  • Product/Service Code: 6632 (Analysis Instruments, Medical Laboratory Use)
  • Set-Aside: None specified
  • Response Due: March 26, 2026, 5:00 PM ET
  • Published Date: March 20, 2026
  • Place of Performance: Oak Ridge, TN, United States

Key Requirements & Attachments

Bidders must thoroughly review the provided attachments, which are integral to the submission:

  • Attachment C- RFQ450899 Bill of Materials: This document is critical for understanding the precise components and quantities required. Bidders must complete the pricing, lead time, and country of origin fields.
  • Attachment A-Terms-Conditions-Purchase-Order-Commercial-Products-Services: Outlines the mandatory terms and conditions for purchase orders under the Simplified Acquisition Threshold (SAT), covering aspects like warranties, payment, compliance, and termination.
  • Attachment B-Reps-and-Certs-Abbreviated: A mandatory form requiring offerors to make specific representations and certifications regarding organizational type, export control, Buy American Act compliance, child labor, telecommunications equipment, conflict of interest, and business size.
  • Attachment D-Prime-Flowdown-Clauses: Details additional mandatory FAR and DEAR clauses, along with DOE directives, that are flowed down from ORNL's prime contract (DE-AC05-000R22725) to subcontracts and purchase orders.

Contact Information

For questions regarding this opportunity, please contact Katherine Plourde at plourdek@ornl.gov or 865-341-2230.

People

Points of Contact

Katherine PlourdePRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 20, 2026
Heated (45 °C) Absolute Baratron® Capacitance Manometer, Power supply & Readouts, Cables, Mass Flow controller. | GovScope