High-pressure XPS System
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Institute of Standards and Technology (NIST) is soliciting quotations for a High-pressure XPS System (HPXPS) to support the CHIPS R&D: Metrology Program. This Combined Synopsis/Solicitation seeks an advanced system for precise, real-time chemical analysis of wafer surfaces during plasma processing. Quotations are due by April 29, 2026, at 11:00 AM ET.
Scope of Work
NIST requires the procurement, installation, and training for a High-Pressure XPS system. This includes an AP (NAP) XPS analyzer, a Near Ambient Pressure Monochromatized X-ray source, and differential pumping systems with control electronics. The system is critical for in-situ chemical analysis of wafer surfaces and must meet specific technical requirements for pressure operation, spectral resolution, and beam characteristics.
Key Requirements & Clarifications
- System Components: AXPS analyzer, Near Ambient Pressure Monochromatized X-ray source, differential pumping system/electronic controls.
- Technical Specifications: Must meet or exceed all technical specifications outlined in the revised Statement of Work. The mandatory 20 Torr water vapor requirement remains.
- Chamber Compatibility: The requirement for compatibility with NIST's custom reaction chamber has been omitted. NIST will work with the vendor's standard chamber; bidders must include details on their standard chamber.
- Shipping: NIST requires FOB Destination (domestic) or DDP (international). DAP is not acceptable.
- Payment Milestones: NIST is open to alternate payment schedules linked to deliverables (e.g., "delivery of system drawings").
- Period of Performance (PoP): Approximately 48 weeks After Receipt of Order (ARO). NIST is open to revising PoP milestones (e.g., Factory Acceptance at 10 weeks ARO, System Delivery at 20 weeks ARO) and the Site Visit requirement (12 weeks ARO) with vendor rationale.
- New Equipment: All items must be new; used, remanufactured, experimental, or prototype items are not acceptable.
- Warranty: Minimum of 1 year after receipt of equipment.
Contract Details
- Contract Type: Firm-fixed-price purchase order.
- Set-Aside: Unrestricted competition.
- NAICS Code: 334516 - Analytical Laboratory Instrument Manufacturing.
- Small Business Size Standard: 1,000 employees.
- Place of Performance: NIST, 100 Bureau Dr., Building 216, D109 lab, Gaithersburg, MD 20899.
Submission & Evaluation
- Submission Deadline: April 29, 2026, at 11:00 AM ET.
- Submission Method: Email quotations to forest.crumpler@nist.gov and donald.collie@nist.gov. Reference RFQ number 1333ND26QNB030170 in the subject line.
- Quotation Preparation: Must be clearly written, indexed, and logically assembled into four volumes:
- Technical Quotation: Demonstrate capability to meet/exceed requirements.
- Demonstrated Experience: Up to three relevant contracts/projects.
- Price Quotation: Firm-fixed-price for each CLIN, valid for 90 days.
- Terms and Conditions: Review and complete required information.
- Evaluation Criteria: Best-value basis, with non-priced factors (Technical Capability, Experience) significantly more important than price.
- Pre-Quote Inquiries: Submit written questions to the contacts no later than 5 calendar days after the solicitation issuance date. Responses will be issued via amendment.
Important Notes
- SAM.gov Registration: Offerors must have an ACTIVE registration in SAM.gov at the time of quotation submission, award, performance, and final payment.
- Subcontracting Plan: This requirement is subject to a small business subcontracting plan. If no subcontracting opportunities exist, a separate document explaining why is required.
- Applicable Clauses: Bidders must review Attachment 2 for mandatory FAR and agency-specific clauses, including those related to payment, termination, warranty, country of origin, security prohibitions, and protest procedures.