HMI KIT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, is seeking proposals for the procurement of an HMI KIT (Part Number: MG-043274-01). This is a Total Small Business Set-Aside opportunity. The kit is to be manufactured by DRS Naval Power Systems Inc. (CAGE 27192). Proposals are due by July 20, 2026.
Scope of Work
This solicitation is for the manufacture and design of the specified HMI KIT, which includes components such as MC-057157, MC-067427, MS51496-73, MC-067599, MS35338-138, MS35650-304, 32-2684, MC-024513B, and MC-034728B. The part number is considered fully descriptive, and no additional technical documents, drawings, or data are associated with this solicitation. A key requirement is the exclusion of mercury or mercury-containing compounds from the hardware or supplies.
Contract & Timeline
- Type: Solicitation
- Set-Aside: Total Small Business
- Response Due: July 20, 2026, 8:30 PM EDT
- Published: June 22, 2026
- Pricing: Quotations are valid for 60 days after the closing date, unless otherwise specified.
Key Requirements & Clauses
- Order of Precedence: In case of conflict, Section "C" of the contract/purchase order takes precedence over Section "D". The general order of precedence for documents is Amendments > Schedule > Terms & Conditions > IRPOD > STRS > Drawings > Specifications.
- Quality Assurance: Contractors must maintain an inspection system acceptable to the Government.
- Packaging: Requirements include MIL-PRF-23199, MIL-DTL-24466 green poly bags (if cleanliness controls are invoked), and MIL-STD 2073. Fire retardant packaging material is no longer required.
- Data Deliverables (DD Form 1423): A detailed explanation of DD Form 1423 blocks is provided. A Certificate of Compliance (DI-MISC-81356) is required at the time of material delivery for each unique combination of Contract/Purchase Order Number, National Stock Number, and Item Nomenclature.
- Cybersecurity: Notice of Cybersecurity Maturity Model Certification Level Requirements (NOV 2025) applies.
Contact Information
For inquiries, contact COLLIN.A.BROWNING.CIV@US.NAVY.MIL or call 564-226-1306.