Hopewell Recreation Site Improvements on the Carson National Forest

SOL #: 127EAX26Q0008Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
Carson National Forest
TAOS, NM, 87571, United States

Place of Performance

Tres Piedras, NM

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Maintenance Of Recreational Buildings (Z1FB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 2, 2026
2
Submission Deadline
May 8, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service, Carson National Forest, is soliciting quotations for Hopewell Recreation Site Improvements at the Tres Piedras Ranger District in Rio Arriba County, New Mexico. This Total Small Business Set-Aside opportunity involves significant construction work to upgrade the Hopewell Lake Campground facilities. Quotations are due by May 8, 2026, at 12:00 PM MST.

Scope of Work

The project encompasses a range of site improvements, including:

  • Construction of a new site entrance roundabout, campground entrance road, and trailhead parking lot.
  • Modification of the parking lot at the group area.
  • Installation of a new waterline, hydrants, and a new campground host site.
  • Provision of new site furnishings.
  • Extensive clearing and grubbing for new roads and parking areas.
  • Installation of bulletin boards, aggregate surfaced roadways, signs, barrier rocks, curb stops, and culverts.

Detailed requirements are outlined in the Statement of Work (Attachment 2) and comprehensive drawings (Attachment 3). Bidders must also refer to the Schedule of Items (Attachment 1) which includes base and optional pay items.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ).
  • Contract Type: Firm-Fixed Price.
  • Set-Aside: Total Small Business Set-Aside (NAICS 238990, size standard $19 million).
  • Period of Performance: 365 calendar days from the Notice to Proceed (NTP), with work commencing 10 days after NTP.
  • Place of Performance: Hopewell Lake, Tres Piedras Ranger District, Carson National Forest, Rio Arriba County, New Mexico.
  • Wage Determination: General Decision Number NM20260011 (Attachment 4) applies, detailing prevailing wage rates for heavy construction in the region.

Key Dates

  • Questions Due: April 28, 2026, by 12:00 PM MST.
  • Site Visit: April 22, 2026, at 11:00 AM Mountain Time at Hopewell Lake Campground.
  • Quotations Due: May 8, 2026, by 12:00 PM MST.

Submission & Evaluation

Offerors must submit pricing for all items, including optional items, to be considered responsive. Evaluation will be based on three factors:

  1. Technical Approach: Assessment of the offeror's sound and compliant approach, capabilities, subcontracting plans, and electrical skills.
  2. Price: Evaluated for fairness and reasonableness.
  3. Past Performance: Assessed as Acceptable or Neutral.

All communications and questions should be directed to Melissa Heckenlaible via email at melissa.heckenlaible@usda.gov. Submitted prices must remain firm for 90 calendar days from the offer due date.

Special Requirements

Contractors must adhere to specific requirements, including submitting an erosion control plan, pressure washing equipment before entering National Forest System lands, providing temporary toilet facilities, locating existing utilities, sourcing materials that blend with the landscape, and implementing traffic control conforming to MUTCD, including re-routing pedestrian traffic on the Continental Divide Trail. Compliance with FSORAG, FSTAG, and ABA accessibility guidelines is also mandatory.

People

Points of Contact

Melissa HeckenlaiblePRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
Hopewell Recreation Site Improvements on the Carson National Forest | GovScope