HORN,SIGNAL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mechanicsburg (NAVSUP WSS MECH), is soliciting proposals for the repair of HORN,SIGNAL units. This opportunity is issued under Emergency Acquisition Flexibilities (EAF) and is a Total Small Business Set-Aside. The resultant award will be bilaterally issued, requiring contractor acceptance. Proposals are due June 05, 2026.
Scope of Work
This requirement covers the repair and quality assurance for HORN,SIGNAL units, ensuring they meet operational and functional requirements as represented by Cage Code/Reference Number 6W438 M15303-IC/H2S4. Repair work must adhere to the contractor's standard practices, manuals, and technical documents, including MIL-STD-129 and MIL-A-15303. A critical requirement is that all materials must be mercury-free to prevent contamination, especially for use on submarines/surface ships. Packaging shall be in accordance with MIL-STD 2073.
Contract & Timeline
- Opportunity Type: Solicitation
- Set-Aside: Total Small Business
- Response Due: June 05, 2026, by 20:30 UTC
- Published Date: May 07, 2026
- Certification: This contract will be "DO" certified under the Defense Priorities and Allocations System (DPAS).
- Option Provision: Includes an option for additional quantities up to 365 days after award.
Key Requirements & Instructions
Offerors must provide an Estimated (EST) repair price for the full repair effort. Vendors are required to complete a Teardown & Evaluation (TD&E) within 90 days of carcass receipt and submit a Firm-Fixed Price (FFP) quote. Quotes must include the cost of new (actual or estimated) for evaluation purposes and specify any exceptions to solicitation requirements. Contractors must also provide:
- Teardown & Evaluation Rate
- Repair Turn Around Time (RTAT) (quotes must reference proposed RTAT)
- Throughput Constraint
- Induction Expiration Date Price reductions will be incurred for not meeting the required RTAT. Access to drawings, if included, must be requested via SAM.gov, followed by an email to the Point of Contact. The contractor is responsible for all inspection and testing per original manufacturer specifications.
Contact Information
For inquiries, contact JOCELYNE.DZONANGFOUEGO.CIV@US.NAVY.MIL or call 717-605-2982.