95--HPTC FURNISH & INSTALL INDE ADA RAMPS

SOL #: 140P2126R0010Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
WASHINGTON CONTRACTING OFFICE
LAKEWOOD, CO, 80225, United States

Place of Performance

Place of performance not available

NAICS

Ornamental and Architectural Metal Work Manufacturing (332323)

PSC

Structural Shapes, Nonferrous Base Metal (9540)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 2, 2026
2
Last Updated
Apr 16, 2026
3
Submission Deadline
Mar 23, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), through its Washington Contracting Office, is soliciting proposals for the furnishing and installation of ABA-compliant stainless-steel ramps and bronze railing systems at Independence Hall, Congress Hall, and Old City Hall in Philadelphia, PA. This is a Total Small Business Set-Aside opportunity. Proposals are due by March 23, 2026, at 12:00 PM ET.

Scope of Work

The contractor will provide all necessary labor, materials, equipment, and travel to furnish and install approved ABA-compliant stainless-steel ramps and bronze railing systems tailored to the specific field conditions of each historic site. Key requirements include providing shop drawings for review and approval, ensuring installation complies with ABA specifications detailed in the 'Ramp and Stair Modifications' drawing set, removing all waste and debris, and providing maintenance guidelines/SOP. An amendment has revised the scope, and the government is open to alternative material recommendations (e.g., for stainless steel alloy and lead times), encouraging bidders to propose solutions via the Contract Pricing Form and Required Shop Drawings.

Contract Details

  • Type: Firm-fixed-price
  • Period of Performance: April 1, 2026, to May 25, 2026
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 332323 (Ornamental & Architectural Metalwork and Manufacturing), Size Standard: 500 Employees
  • Submission Deadline: March 23, 2026, by 12:00 PM ET
  • Submission Method: Electronically via email to tavis_salas@nps.gov, with the subject line "Solicitation Number 140P2126R0010 – INDE – ADA Ramps Installation."

Evaluation

Award will be made to the offeror who submits the best overall quote, determined as the lowest priced technically acceptable. Evaluation will focus on price reasonableness and realism.

Key Documents & Amendments

  • Amendment 0001 (March 10, 2026): Incorporated revised scope, included answers to vendor questions, and replaced the original Attachment C (Price Sheet) to remove an erroneous specification.
  • Attachment A (As-Built Drawings): Provides crucial technical specifications, scope, and design details for demolition and new ADA-compliant ramp and stair modifications.
  • Revised Attachment C (Cost/Price Sheet): Details material and labor costs, including stock bronze and stainless steel components, essential for developing cost proposals.
  • RFI Responses: Clarified material lead times and stainless steel alloy specifications, indicating government flexibility for alternative recommendations.
  • Attachment B (Hot Work Policy): Outlines safety requirements and approval processes for any heat-producing activities, requiring a permit.

Additional Notes

All contractors must be registered in www.SAM.gov to be considered eligible for award. The primary point of contact is Tavis Salas (tavis_salas@nps.gov, 2409975826).

People

Points of Contact

Salas, TavisPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 10, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
View