Hulah Lake Toe Drain, Bowring, Oklahoma
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system including, but not limited to, perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping. The new toe drain system will tie into the existing manholes 6 and 8.4. Construction of new toe road culverts including, but not limited to, reinforced concrete pipe, pre-cast flared ends, and riprap around new flared ends.