HYDROGEN GENERATOR

SOL #: W911S225U0625Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT DRUM
FORT DRUM, NY, 13602-5220, United States

Place of Performance

Place of performance not available

NAICS

Motor and Generator Manufacturing (335312)

PSC

Generators And Generator Sets, Electrical (6115)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 8, 2025
2
Submission Deadline
Apr 16, 2025, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

HYDROGEN GENERATOR Must be able to produce Hydrogen at a rate of 250 mL/min that is 99.99996% pure @ 160psiMust be powered by 110-120V 60Hz or 220-240V 50HzMust have a touch screen with operating parameters, system status and safety alarmsMust have a cell assembly that is 100% TitaniumMust have a Cold Dual Dynamic Regeneration systemMust have Multi-point Safety shut-down leak sensorsMust have Seismic zone vibration safety sensorsMust have a minimum warranty of 2 yearsMust have an internal water tank with a capacity of no more than 2.5 litersMust have the option of a continuous water feed from an external sourceMust have 1/8? compression connection for the outletMust have a operating temperature range between 59F to 95FMust have a low water safety shut off systemMust weigh no more than 33 lbsMust have dimensions of no more than 9?W x 19?H x 15?D to fit set compartment of useMust run at no more than 165 WattsMust run on a minimum deionized water quality of less than 1 micro S/cm @25C

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 8, 2025
HYDROGEN GENERATOR | GovScope