ICBM Cable Assembly, Powe
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Ogden, UT has issued a solicitation for the manufacturing of ICBM Cable Assemblies, Power. This acquisition is for thirty each of NSN 6150-00-264-0733 AH and thirty each of NSN 6150-00-613-0343 AH. Offers are due by February 27, 2026.
Scope of Work
This opportunity requires the manufacturing of specific electrical cable assemblies, including adherence to stringent military standards for preservation, packaging, and marking. Key requirements include:
- Manufacturing of the specified ICBM cable assemblies.
- Application of Item Unique Identification (IUID) and marking per MIL-STD-130.
- Ensuring supply chain traceability.
- Compliance with detailed Special Packaging Instructions (SPI) for both NSNs, including MIL-STD-2073 (preservation), MIL-STD-129 (marking), and ISPM No. 15 (wood packaging material).
- Adherence to Engineering Data Requirements (HILL AFB FORM 462) for PN 21-53482, NSN 6150-00-264-0733AH.
- Preparation and submission of Safety Data Sheets (SDS) and hazardous materials packaging certification, if applicable.
Contract & Timeline
- Type: Solicitation
- Restriction: Restricted to a qualified source: The Boeing Company (Cage: 0B0D7).
- Published: January 13, 2026 (latest amendment publication)
- Offer Due: February 27, 2026
Key Deliverables
Contractors must provide several data items as part of the Contract Data Requirements List (CDRLs):
- First Article Test Plan (CDRL A002): Draft due 90 calendar days prior to test, final 14 days after Government comments.
- First Article Test Report (CDRL A001): Due 60 calendar days after First Article Test conclusion, final 14 days after Government comments.
- Product Engineering Design Data and Updated Drawings (CDRL A003): Most recent updated drawings for NSN 6150-00-613-0343 and NSN 6150-00-264-0733. All data submissions require electronic delivery via Wide Area Work Flow (WAWF) and are subject to Distribution Statement D and export control restrictions.
Evaluation
The primary evaluation factor for this acquisition is Price or Cost.
Additional Notes
Early and partial deliveries are acceptable. The contractor must inform the Contract Administrator of any potential delays. For inquiries, contact Kody Quayle (kody.quayle@us.af.mil).