ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road

SOL #: 69056726R000010Pre-Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Kuna, ID

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Jun 4, 2026
2
Last Updated
Jun 4, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, has issued a Presolicitation for a Firm-Fixed-Price MATOC Task Order for the ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road project. This opportunity is for existing Idaho, Montana, and Surrounding Areas MATOC contractors. The project involves significant road improvements approximately 7 miles south of Kuna, Idaho, with an estimated price range of $5 million to $10 million.

Project Scope

This project focuses on comprehensive road infrastructure improvements along the Western Heritage Byway - Swan Falls Road. Key work elements include:

  • Shoulder widening, paving, and signage installation.
  • Parking lot improvements and culvert replacement.
  • Detailed construction activities cover surveying, quality control, soil erosion and sediment control, dust control, earthwork (clearing, grubbing, cattle guard removal), slope reinforcement, aggregate and base courses, asphalt and rigid pavements (including fog seal, chip seal, milling, crack sealing), and various incidental constructions (pipe culverts, sidewalks, fencing, turf establishment).
  • The project also includes sign systems, pavement markings, and temporary traffic control measures.
  • The total project length can be up to 8.5 miles, with four distinct bid schedules, only one of which will be awarded.

Contract Details & Timeline

  • Contract Type: Firm-Fixed-Price (FFP) MATOC Task Order.
  • Estimated Value: Between $5,000,000 and $10,000,000.
  • Set-Aside: Not applicable; this is a task order solicited to existing Idaho, Montana, and Surrounding Areas MATOC contractors.
  • Tentative Solicitation Date: Summer 2026.
  • Tentative Completion Date: Summer/Fall 2027.
  • Place of Performance: Kuna, Idaho.

Key Documents

  • Project Description: Provides detailed work requirements, including specific construction divisions and tentative completion dates.
  • Preliminary Plans (Sheet Index): Offers a comprehensive overview of the project's technical drawings, crucial for understanding the scope and preparing bids.

Action Items

Interested Idaho, Montana, and Surrounding Areas MATOC contractors should review the preliminary plans and project description. To receive notifications when the solicitation documents are posted, follow this opportunity on SAM.gov. Contact Contracts G. Office at wfl.contracts@dot.gov or 360-619-7520 for inquiries.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
View

Versions

Version 2Viewing
Pre-Solicitation
Posted: Jun 4, 2026
Version 1
Pre-Solicitation
Posted: Jun 4, 2026
View
ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road | GovScope