IDIQ SMALL BUSINESS SET-ASIDE MACC FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF COMMERCIAL AND INSTITUTIONAL FACILITIES AT VARIOUS GOVERNMENT INSTALLATIONS LOCATED IN CA, AZ, NV, UT, CO, AND NM

SOL #: N6247321D1025-P00003Justification

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM SOUTHWEST
SAN DIEGO, CA, 92132-0001, United States

Place of Performance

San Diego, CA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Jun 17, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy (NAVFAC SW) has published a Justification and Approval (J&A) for a 12-month bridge contract extension for existing HUBZone Small Business Set-Aside Multiple Award Construction Contracts (MACC). This action extends the period of performance for new construction, repair, and renovation of Commercial and Institutional (C&I) facilities at various government installations across California, Arizona, Nevada, Utah, Colorado, and New Mexico. The extension is from June 07, 2026, to June 07, 2027, for three specific contractors.

Purpose & Scope

This J&A justifies the use of other than full and open competition to extend three existing HUBZone GC MACC contracts. The primary purpose is to prevent a critical gap in mission capability while NAVFAC SW finalizes follow-on procurements. The contracts support task orders for new construction, renovation, and repair of C&I facilities, utilizing Design-Build (DB) or Design-Bid-Build (DBB) methodologies. Facility types include, but are not limited to, airport buildings, offices, communications facilities, vehicle maintenance facilities, armories, barracks, hospitals/medical facilities, and schools.

Contract Details

  • Original MACC Contracts: Awarded on June 8, 2021, to nine contractors.
  • Aggregate Value: $495,000,000 (after an initial three-year option).
  • Current Completion Date: June 7, 2026.
  • Proposed Extension: 12 months, from June 8, 2026, through June 7, 2027.
  • Affected Contracts: Three eligible contracts (I.E. Pacific, Inc., Peter Vander Werff Construction, Inc., and SGS, LLC).
  • Capacity: Existing contract capacity is sufficient; no additional capacity or increase to the overall contract ceiling is required.

Eligibility / Set-Aside

This extension is specifically for three contractors who retain their small business size status and HUBZone Small Business certification. This is not a new solicitation for bids.

Action / Response

This document is a Justification and Approval (J&A) for an existing contract modification and does not require proposal submissions from new vendors. It is for informational purposes regarding the extension of current contracts.

Additional Notes

Delays in awarding new contracts are attributed to systemic issues including government shutdowns, furloughs, and staffing reductions. NAVFAC SW plans to utilize other contract vehicles for future task orders in the $3,000,000 to $9,000,000 range.

People

Points of Contact

Kansas HannekenPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: Jun 17, 2026
IDIQ SMALL BUSINESS SET-ASIDE MACC FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF COMMERCIAL AND INSTITUTIONAL FACILITIES AT VARIOUS GOVERNMENT INSTALLATIONS LOCATED IN CA, AZ, NV, UT, CO, AND NM | GovScope