Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The U.S. Army Corps of Engineers, Rock Island District has a requirement for a construction contract for the project known as: Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A.Project Description: The work includes, but is not limited to, construction of aquatic nuisance species (ANS) deterrents: Automated Barge Clearing Deterrent (ABCD); Bubble Curtain Deterrent (BCD); and Acoustic Deterrent; support facilities and access roads, excavation within the Short Engineered Channel (SEC) to include, but not limited to: demolition; clearing, grubbing, and stripping; underwater excavation of rock and sediment; fabricated building systems; electrical work; mechanical work; plumbing work; structural work; architectural finishes and specialties; TAB and commissioning; directional drilling; concrete work; sheet pile work; fabrications; emergency, interior and exterior lighting work; cybersecurity work; electronic security systems; earthwork; floating dock and boat ramp construction; asphalt paving; riprap placement; chain-link fencing and gates; salvage materials for reinstallation; generator installation; site and building signage; surveying; instrumentation and monitoring; and site restoration.NAICS Code: 237990Size Standard: $45,000,000.00Estimated Range: Between $100,000,000 and $250,000,000 Unrestricted, Best Value Trade-OffQuestions regarding this solicitation shall be submitted via ProjNet by 2:00 PM CST on 11 June 2025. See Item #4 within the Instructions to Offerors - Important Notes Regarding the Acquisition section for additional information. ****Amendment 0001 - The purpose of this amendment is to update clauses 52.211-10 and 52.211-12, provide updated plans and specification documents, extend the due date for submission of questions via ProjNet to 2:00 PM CST on 14 July 2025, extend the due date for submission of proposals, and add another site visit date. ****Amendment 0002 - The purpose of this amendment is to add Project Labor Agreement (PLA) requirement, add clauses FAR 52.222-33 and 52.222-34, update Attachment A - Past Performance Questionnaire, and include geotech reference documents as Attachments F, G, and H.