Industrial High Temperature Heater System

SOL #: W15QKN25QA025Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-PICA
PICATINNY ARSENAL, NJ, 07806-5000, United States

Place of Performance

Place of performance not available

NAICS

Air and Gas Compressor Manufacturing (333912)

PSC

Miscellaneous Construction Equipment (3895)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 19, 2024
2
Last Updated
Mar 5, 2025
3
Submission Deadline
Mar 10, 2025, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The Combat Capabilities Development Command - Armaments Center (DEVCOM-AC), Munitions Engineering and Technology Center (METC), Fuze and Precision Armaments Directorate (FPAD), Aeroballistics Division has a requirement to upgrade the supersonic wind tunnel in Building 266 Picatinny Arsenal, NJ 07806-5000. The tunnels are used to simulate the actions of an object inflight. This effort is a purchase order to acquire the heater element (and ancillary equipment) to support the upgrade of the supersonic wind tunnel inbuilding 266 from supersonic to hypersonic. The effort is merely to purchase all the hardware necessary for the upgrade. This effort does not include any other activities that needed to be accomplished to achieve hypersonic capability. AMENDMENT 0001 IS FOR A 45-DAY EXTENSION UNTIL 10 MARCH 2025, 5:00 PM EASTERN STANDARD TIME (EST).

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Mar 5, 2025
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 3, 2025
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jan 17, 2025
Version 1
Combined Synopsis/Solicitation
Posted: Dec 19, 2024
View
Industrial High Temperature Heater System | GovScope