Industry Day - Mobile Harbor GRR

SOL #: W91278-20-MobileHarborGRRSpecial Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W074 ENDIST MOBILE
MOBILE, AL, 36602-3630, United States

Place of Performance

Mobile, AL

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Maintenance Of Dredging Facilities (Z1KF)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 23, 2020
2
Action Date
Feb 12, 2020, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

INDUSTRY DAY NOTIFICATION

9:00AM – February 19, 2020 – Mobile, AL

Mobile Harbor, Alabama

 

The U.S. Army Corps of Engineers, Mobile District, will be conducting an industry day to discuss an implementation plan for channel modifications proposed in the Mobile Harbor GRR. The Recommended Plan includes the following navigation improvements: deepen the existing Bar, Bay, and a portion of the River Channels by 5 ft; incorporate bend easings in the Bar Channel; widen the Bay Channel to 500 ft from the mouth of Mobile Bay northward for 3 nautical miles; and, expand the Choctaw Pass Turning Basin 250 ft to the south.  Placement areas for the new work material dredged for the proposed navigation improvements are as follows: Relic Shell Mined Area, Sand Island Beneficial Use Area (SIBUA), and the Ocean Dredged Material Disposal Site (ODMDS). The Mobile Harbor Final GRR/SEIS Main Report can be found at the following link (See paragraph 4.2.1. for New Work Material Placement Options):

http://www.sam.usace.army.mil/Missions/Program-and-Project-Management/Civil-Projects/Mobile-Harbor-GRR/Mobile-Harbor-GRR-Downloads/

The industry day event will be held from 9:00 to 12:00 CST on Wednesday, February 19, 2020 at 201 Saint Michael Street, Mobile, AL 36602 in Training Room 1. The meeting will consist of a general session with a presentation on the recommended plan, proposed contracting approach and schedule followed by an open discussion/feedback period. Additionally, individual 30 minute break out sessions will be held, at the request of the contractor, after the general session is over. Contractor comments and suggestions are strongly encouraged.

It is anticipated the work will be advertised under multiple Invitation for Bid (IFB) solicitations, which will result in corresponding awards of “C” type contracts, with the initial contract advertisement as early as Summer 2020. The phasing strategy, periods of performance, and number of contracts will be a discussion topic.

Please e-mail Mr. David Newell at David.P.Newell@usace.army.mil by 1700 CST on February 12, 2020 if you plan to attend this event.  Provide your name, contact information, the company you represent, the number of people in your party who will attend, and whether or not you want to participate in a 30 minutes individual break out session.

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Special Notice
Posted: Jan 23, 2020
Industry Day - Mobile Harbor GRR | GovScope