Industry Feedback Requested: USACE’s Progressive Design Build with Other Transaction Authority Process

SOL #: bbd3010cc14242e88b25eb2422a927feSpecial Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
US ARMY CORPS OF ENGINEERS

Place of Performance

Place of performance not available

NAICS

No NAICS code specified

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Jun 22, 2026
2
Action Date
Jul 8, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE), Headquarters, Directorate of Contracting, is requesting industry feedback on its developed procedures for executing Progressive Design Build (PDB) for military construction projects utilizing an Other Transaction Authority (OTA) procurement method. This is a Special Notice to refine draft documents and inform USACE's approach. Feedback is due by 4 PM Eastern on July 8, 2026.

Purpose and Scope

USACE aims to improve and align its PDB w/OTA approach with commercial practices. PDB is a collaborative delivery method where a design-builder is selected based on qualifications, not price, to work jointly with the Government through design and preconstruction services, establishing a Guaranteed Maximum Price (GMP) before construction. OTA is a legally binding agreement not subject to the Federal Acquisition Regulation (FAR), authorized under 10 U.S.C. § 2808a for facility construction and repair.

Documents for Feedback

Industry feedback is sought on three attachments, with specific questions provided in a fourth:

  • Attachment A: Placemat - PDB with OTA Process Overview — Provides a high-level, two-phase overview (Agreement Phase 1: Design & Preconstruction; Agreement Phase 2: Final Design & Construction), emphasizing early alignment, open-book collaboration, and iterative flexibility.
  • Attachment B: Playbook - Executing PDB with OTA — A comprehensive guide for USACE Project Delivery Teams, detailing the three-phase process (Pre-Agreement, Agreement Phase 1, Agreement Phase 2), OTA authority, procurement steps, collaboration, risk management, and financial structuring. It highlights a shift from traditional FAR-based procedures to commercial agility.
  • Attachment C: Agreement Articles - PDB with OTA — A comprehensive set of draft terms and conditions for the PDB OTA Agreement, covering definitions, scope, term, payment, bonding, dispute resolution, data rights, security, and specific PDB responsibilities. It defines the legal and contractual framework.
  • Attachment D: PDB with OTA Industry Questionnaire — Contains specific questions for industry regarding GMP, payment terms, bonding, small business teaming, Phase 1 off-ramps, design intellectual property, and alignment with industry best practices.

How to Provide Feedback

Responses and questions must be submitted via "Bidder Inquiry" in ProjNet (https://www.projnet.org) no later than 4 PM Eastern on July 8, 2026. If responding to Attachment D questions, submit separate entries for each. Proprietary or sensitive information should not be submitted through ProjNet. The Bidder Inquiry Key is HA6G6E-34M6NF. Firms interested in one-on-one meetings for further dialogue should indicate this in their response.

Contract & Timeline

  • Contract Opportunity Type: Special Notice
  • Set-Aside: None specified
  • Response Due: July 8, 2026, 4 PM Eastern
  • Published: June 22, 2026

Contact Information

People

Points of Contact

Brooke PattersonPRIMARY
Scott HelmerSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Special Notice
Posted: Jun 22, 2026
Industry Feedback Requested: USACE’s Progressive Design Build with Other Transaction Authority Process | GovScope