Inspection and grounding tests for electrical distribution systems in accordance with Italian DPR n. 462/2001 at USAG ITALY DMC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The DEPT OF THE ARMY is soliciting proposals for Inspection and Grounding Tests for Electrical Distribution Systems at USAG Italy DMC (Camp Darby, Tirrenia, Pisa, Italy). This is an unrestricted Firm-Fixed Price contract, requiring compliance with Italian DPR n. 462/2001. Proposals are due June 12, 2026, at 15:00 PM (Local time, Rome, Italy).
Scope of Work
The contractor shall provide non-personal services to perform inspections and grounding tests for electrical distribution systems across various buildings and structures within USAG Italy DMC. This includes providing all necessary tools, equipment, personnel, and supervision. Services must adhere to Italian norms (CEI EN 6193-6, CEI EN 50522, CEI 0-14, DPR n.462-2001, D.Lgs 81-2008). Key tasks involve visual inspections, measuring electrical continuity and resistance to ground, evaluating protection coordination, functionally testing ground fault devices, and providing certifications of compliance or non-compliance within 10 calendar days of inspection. The service is required every two years.
Contract Details
- Contract Type: Request for Quotation (RFQ) resulting in a Firm-Fixed Price contract.
- Performance Period: July 15, 2026 – December 31, 2026.
- Place of Performance: Camp Darby, Tirrenia (Pisa), Italy.
- NAICS Code: 541350 (Engineering Services).
- PSC: H259 (Equipment And Materials Testing: Electrical And Electronic Equipment Components).
- Set-Aside: Unrestricted.
Eligibility & Requirements
Offerors must be an organization certified by the Italian "Ministero delle imprese e del made in Italy" to perform periodical checks on electrical systems as per Italian Law DPR 462/01, and registered on their official website. All offerors must have a Unique Entity Identifier (UEI), a CAGE/NCAGE number, and be registered in the System for Award Management (SAM.gov) with current information, including completed provision 52.212-3. Personnel must meet specific qualifications, including PES certification, and adhere to safety laws, providing an Accident Prevention Plan and Activity Hazard Analysis. Required training includes Anti-Terrorism (AT) Level I, OPSEC Level I, and iWATCH training.
Submission & Evaluation
- Submission Deadline: June 12, 2026, 15:00 PM (Local time, Rome, Italy).
- Submission Method: Quotes must be submitted via email in Adobe Acrobat (PDF) format to Sonia Zanobini (sonia.zanobini2.ln@army.mil) and Brendan A. Deluca (brendan.a.deluca.civ@army.mil). The subject line must be "W912PF26QA031, Inspections and grounding tests for electrical distribution systems".
- Evaluation: Lowest Price Technically Acceptable (LPTA) source selection. Award will be made to the lowest-priced offer meeting all minimum mandatory criteria. Evaluation factors are: Factor I: Certifications (Acceptable/Unacceptable) and Factor II: Price.
Key Documents
Important attachments include the Performance Work Statement (PWS) detailing the scope, DUVRI (Single Document for the Assessment of Interferential Risks) outlining hazards and safety measures, a Self-Certification for Anti-mafia Communication (mandatory), and Hazard General List and Emergency Plans for the Camp Darby Military Community.
Points of Contact
- Primary: Sonia Zanobini (sonia.zanobini2.ln@army.mil, 00390509658762)
- Secondary: Brendan A. Deluca (brendan.a.deluca.civ@army.mil, 00390509658760) Questions are encouraged via email no later than ten (10) calendar days following the RFQ issue date.