Install Lift Station- FCI Bastrop
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Bureau of Prisons (FBOP) is soliciting proposals for a Firm Fixed-Price construction contract to Install a Lift Station at the Federal Correctional Institution (FCI) Bastrop, Texas. This opportunity is a 100% Small Business Set-Aside. Proposals are due June 9, 2026, at 11:00 AM PST.
Scope of Work
The project involves the removal of an existing septic tank and associated piping, followed by the installation of a new fiberglass manhole with a grinder pump and a new duplex sewer lift station in a precast concrete sump. The sewer system will then be extended to a Corix Utilities tie-in location. The awarded contractor will be responsible for coordinating all work with Corix Utilities and covering any associated tie-in costs. The performance period is 210 Calendar Days from the issuance of the notice to proceed.
Contract Details
- Type: Firm Fixed-Price construction contract
- Set-Aside: 100% Small Business Set-Aside (Total Small Business Set-Aside, FAR 19.5)
- NAICS: 237110 (Small Business Size Standard: $45 million)
- Performance Period: 210 Calendar Days
- Response Due: June 9, 2026, at 11:00 AM PST
- Published: May 26, 2026 (latest amendment)
Submission & Evaluation
Offers must be submitted electronically via JEFS APP BOX (https://jefs.app.box.com/f/4564cbb6ae2a479d9064980a88ea2fe1). Required documents include SF-1442, Commodity or Services Schedule, Representations and Certifications, and a Bid Bond (SF-24). The Bid Bond must be 20% of the bid price or $3,000,000, whichever is less. Performance and Payment Bonds are required within 10 days after award. Evaluation will be conducted in accordance with FAR 52.212-2, considering "price and other price related factors," and contractor responsibility will be assessed. Offers must allow for at least 90 calendar days for Government acceptance.
Eligibility & Access
This is a 100% Small Business Set-Aside. Bidders must be registered in SAM.gov as a small business for NAICS code 237110 and meet the specified size standard. Access to secure solicitation documents requires an active SAM.gov registration and a valid Marketing Partner Identification Number (MPIN).
Important Notes
- Amendments: Amendment 0001 incorporated FAR Clause 52.222-90 (DEI Discrimination). Amendment 0002 extended the response deadline. Offerors must acknowledge all amendments.
- Site Visit: A non-mandatory site visit was scheduled for April 29, 2026, at FCI Bastrop. A criminal history check was required for attendees.
- Pre-Bid Questions: Questions were due by May 1, 2026, to Patrick Ford (pford@bop.gov).
- Past Performance: Questionnaires for references and banking information are required by the bid due date.
- Wage Determination: Wage Determination TX20260285, outlining prevailing wage rates for Bastrop County, is included and crucial for labor cost estimation.