Install Lift Station- FCI Bastrop

SOL #: 15BBNF26Q00000062Combined Synopsis/Solicitation

Overview

Buyer

Justice
Federal Prison System / Bureau Of Prisons
FAO
GRAND PRAIRIE, TX, 75051, United States

Place of Performance

Bastrop, TX

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Repair Or Alteration Of Penal Facilities (Z2FF)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 13, 2026
2
Last Updated
May 28, 2026
3
Submission Deadline
Jun 9, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Bureau of Prisons (FBOP) is soliciting proposals for a Firm Fixed-Price construction contract to Install a Lift Station at the Federal Correctional Institution (FCI) Bastrop, Texas. This opportunity is a 100% Small Business Set-Aside. Proposals are due June 9, 2026, at 11:00 AM PST.

Scope of Work

The project involves the removal of an existing septic tank and associated piping, followed by the installation of a new fiberglass manhole with a grinder pump and a new duplex sewer lift station in a precast concrete sump. The sewer system will then be extended to a Corix Utilities tie-in location. The awarded contractor will be responsible for coordinating all work with Corix Utilities and covering any associated tie-in costs. The performance period is 210 Calendar Days from the issuance of the notice to proceed.

Contract Details

  • Type: Firm Fixed-Price construction contract
  • Set-Aside: 100% Small Business Set-Aside (Total Small Business Set-Aside, FAR 19.5)
  • NAICS: 237110 (Small Business Size Standard: $45 million)
  • Performance Period: 210 Calendar Days
  • Response Due: June 9, 2026, at 11:00 AM PST
  • Published: May 26, 2026 (latest amendment)

Submission & Evaluation

Offers must be submitted electronically via JEFS APP BOX (https://jefs.app.box.com/f/4564cbb6ae2a479d9064980a88ea2fe1). Required documents include SF-1442, Commodity or Services Schedule, Representations and Certifications, and a Bid Bond (SF-24). The Bid Bond must be 20% of the bid price or $3,000,000, whichever is less. Performance and Payment Bonds are required within 10 days after award. Evaluation will be conducted in accordance with FAR 52.212-2, considering "price and other price related factors," and contractor responsibility will be assessed. Offers must allow for at least 90 calendar days for Government acceptance.

Eligibility & Access

This is a 100% Small Business Set-Aside. Bidders must be registered in SAM.gov as a small business for NAICS code 237110 and meet the specified size standard. Access to secure solicitation documents requires an active SAM.gov registration and a valid Marketing Partner Identification Number (MPIN).

Important Notes

  • Amendments: Amendment 0001 incorporated FAR Clause 52.222-90 (DEI Discrimination). Amendment 0002 extended the response deadline. Offerors must acknowledge all amendments.
  • Site Visit: A non-mandatory site visit was scheduled for April 29, 2026, at FCI Bastrop. A criminal history check was required for attendees.
  • Pre-Bid Questions: Questions were due by May 1, 2026, to Patrick Ford (pford@bop.gov).
  • Past Performance: Questionnaires for references and banking information are required by the bid due date.
  • Wage Determination: Wage Determination TX20260285, outlining prevailing wage rates for Bastrop County, is included and crucial for labor cost estimation.

People

Points of Contact

Patrick FordPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: May 28, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: May 26, 2026
Version 2
Combined Synopsis/Solicitation
Posted: May 5, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
View