Install of Installation Notification and Warning System
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Amendent 3 extends the closing date to 6-4-2025 and answers RFIs. See attached amendment and RFI document
This amendment extends the closing date to 5-28-2025.
The contractor shall perform installation, configuration, and integration of a Wide-Area Mass Notification System (aka Giant voice) and Indoor Mass Notification Systems (to include visible and audible devices) for identified facilities. The system shall be integrated with associated Network Centric Alerting System (NCAS), automated telephone (robo) calls, Simple Message Service (SMS) text alerts, simultaneous Land Mobile Radio (LMR) and Giant Voice activation. The system shall interface to the base Public Address (PA) system and provide alert precedence override from both the Mass Notification System (MNS) Control station (overrides PA head-end equipment), and from the individual building MNS Autonomous Control Unit (ACU) for single building override.