INSTALLATION OF EXTERIOR LIGHTING AROUND ALL UH BUILDINGS, CFAC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVFACSYSCOM FAR EAST is soliciting quotations for the installation of exterior lighting around all UH buildings at CFA Chinhae, South Korea. This is a Firm Fixed-Price contract for labor, material, equipment, and transportation. Quotations are due April 7, 2026, 02:00 PM KST.
Scope of Work
The contractor shall install exterior lighting around all UH buildings at CFA Chinhae, Korea. The work must be performed in accordance with the Statement of Work dated February 5, 2026, and specific NAVFAC drawings/sketches (NAVFAC DWG/SKETCH # 17363259~17363262). All work is to be completed within 150 calendar days of award.
Contract & Timeline
- Type: Firm Fixed Price Request for Quotation (RFQ)
- Payment: Will be made in Korean Won, with prices expressed in U.S. dollars for administrative convenience.
- Response Due: April 7, 2026, 02:00 PM KST
- Published: March 23, 2026
- Work Completion: 150 calendar days from award
Submission & Evaluation
- Quotations must be priced in Korean Won only; non-compliance will result in non-responsiveness.
- Offerors must be registered in beta.SAM.
- Required submissions include completed SF18 Pages 1 and 2, a Stock Change Certificate, and a Certified Copy of Register.
- Award will be made to the quoter whose quote is most advantageous to the Government, based solely on price.
- A site visitation is scheduled for March 31, 2026, 10:00 AM at the Main Gate of CFA Chinhae.
Eligibility
This RFQ is not a small business set-aside.
Additional Notes
Offerors must submit an Electronic Funds Transfer (EFT) form signed by a Korean bank official. The government has a 120-day acceptance period for offers.