Installation of Fire-rated doors at the Chief of Mission Residence in Madrid, Spain

SOL #: 19SP5026Q0003QuestionsAndAnswersAndAmendment1Solicitation

Overview

Buyer

State
State, Department Of
U.S. EMBASSY MADRID
WASHINGTON, DC, 20520, United States

Place of Performance

Madrid, ES-MD, Spain

NAICS

Residential Building Construction (23611)

PSC

Maintenance Of Other Residential Buildings (Z1FZ)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 23, 2026
2
Submission Deadline
Feb 17, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of State, U.S. Embassy Madrid, has issued RFQ 19SP5026Q0003 for the Installation of Fire-rated doors at the Chief of Mission Residence in Madrid, Spain. This solicitation seeks qualified contractors to replace existing doors with certified fire-rated assemblies to meet updated fire safety codes and Department of State risk mitigation guidelines. Proposals are due February 17, 2026, at 16:00.

Scope of Work

The project involves the supply and installation of certified fire-rated door assemblies, including fire-resistant hardware, panic bars, and door closers, at the Chief of Mission Residence. The scope includes:

  • Replacing nine (9) wooden fire-rated doors on the Ground Floor.
  • Replacing three (3) fire-rated metal doors on the Service Stairs.
  • Installing one (1) fire-rated metal access door in the Ground Floor ceiling.
  • Ensuring compliance with U.S. (NFPA 80, NFPA 101, IBC) and Spanish/European (EN 1634-1, CTE) fire safety and accessibility standards.
  • Maintaining the existing aesthetic, moldings, and design of the materials.
  • Repairing, patching, and painting walls in intervened areas with fire-rated materials.
  • Disposing of all debris and ensuring site cleanup.

Key Requirements & Clarifications

Contractors must conduct a mandatory site visit and survey for measurements, obtain necessary local permits, and submit a comprehensive document package including Product Data, Shop Drawings, a Work Plan with CPM schedule, and an Activity Hazard Analysis (AHA). Existing wooden door subframes can be kept if fire-resistant sealing is ensured, and existing metal frames can be used for new metal doors. All new doors must be equipped with self-closing mechanisms and labeled with fire resistance ratings. If touch-up painting is required, the entire wall must be painted. Specified hardware/paint brands are not mandatory, but materials must be similar to those mentioned in the SOW.

Contract & Timeline

  • Type: Solicitation (RFQ 19SP5026Q0003)
  • Place of Performance: Chief of Mission Residence, U.S. Embassy Madrid, Spain
  • Period of Performance: 140 calendar days after Design approval (110 days for manufacturing, 30 days for installation). Project start within 5 calendar days after Notice-to-Proceed.
  • Set-Aside: None specified
  • Response Due: February 17, 2026, at 16:00
  • Published: January 23, 2026

Contact Information

People

Points of Contact

Jerad S. TietzPRIMARY
Lydia RuizSECONDARY

Files

Files

Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Jan 23, 2026
Installation of Fire-rated doors at the Chief of Mission Residence in Madrid, Spain | GovScope