Installation of Predator Fence

SOL #: 12639526Q1035Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Animal And Plant Health Inspection Service
MRPBS MINNEAPOLIS MN
MINNEAPOLIS, MN, 55401, United States

Place of Performance

Ashland, WI

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 6, 2026
2
Last Updated
May 20, 2026
3
Submission Deadline
Jun 5, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS), Wildlife Services, is soliciting quotes for the installation of a high-tensile woven wire fence for wolf abatement in Ashland County, Wisconsin. This opportunity is a Total Small Business Set-Aside. Quotes are due by June 5, 2026, at noon CT.

Opportunity Details

This combined synopsis/solicitation (Request for Quotations - RFQ) seeks a contractor to install a permanent woven wire fence at 47923 Hwy 112, Ashland, WI 54806. The project aims to mitigate wolf/livestock conflicts. The estimated magnitude of the project is between $25,000 and $100,000.

Scope of Work

The contractor will be responsible for the complete installation of a high-tensile woven wire fence, including:

  • Site Preparation: Clearing the fence line and preparing the site. The property owner is responsible for culvert installation for any ditches requiring them. No large ditch crossings are anticipated outside the break-away fence section, and no rock drilling is expected.
  • Material Supply & Installation: Providing and installing wooden posts (gate, corner, brace, line) and galvanized products (woven wire, vertical fence, horizontal apron, brace wires, staples). Materials must meet specific tensile strength, gauge, mesh spacing, and knot type requirements. A signed statement warranting compliance for materials is required.
  • Post Installation: Setting posts to specified depths and heights, including "double H" construction for gate and corner assemblies. Cement stabilization of posts is required and included in installation costs.
  • Wire Installation: Proper tensioning and attachment of woven wire, and installation of an interior electric fence with specific insulators and wire requirements. The contractor must supply the AC-powered electric fence charger (standard recommendation is 3 joules of output per mile).
  • Special Features: Installation of a stand-alone "Break-Away Fence" for drainage crossings, which will follow the main fence installation specifications but is not physically connected to the main fence.

Contract & Timeline

  • Contract Type: Firm Fixed-Price (implied by RFQ and LPTA evaluation).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Period of Performance: Commencement within five calendar days after Notice to Proceed, with completion within 60 days.
  • Response Due: June 5, 2026, at noon CT.
  • Questions Due: May 29, 2026, at noon CT.
  • Site Visit: May 20, 2026, at 10 a.m. CT.
  • Bonds: A payment bond is required within 10 days of award; a bid bond is not required.
  • Wage Rates: Federal Construction Wage Rates (General Decision Number WI20260011) for Ashland County apply, requiring bidders to account for prevailing wages.

Submission & Evaluation

Quotes must be submitted via email to james.g.roloff@usda.gov. The required package includes the solicitation page, demonstration of relevant experience, and past performance information. Evaluation will be based on a Lowest Price, Technically Acceptable (LPTA) approach. Only the lowest-priced quote will be evaluated for technical acceptability first. Key evaluation factors include Price (with realism analysis), Technical Acceptability (relevant experience with similar fence work), and Past Performance. The government intends to award without negotiations; omissions may lead to technical unacceptability.

Contact Information

Primary Point of Contact: Jim Roloff, james.g.roloff@usda.gov, 612-590-7603.

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 3
Combined Synopsis/Solicitation
Posted: May 20, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 15, 2026
Version 1
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Installation of Predator Fence | GovScope