Installation of Washer and Dryer in Greenhouse

SOL #: 12639526Q0143Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Animal And Plant Health Inspection Service
MRPBS MINNEAPOLIS MN
MINNEAPOLIS, MN, 55401, United States

Place of Performance

Gastonia, NC

NAICS

Plumbing (238220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 9, 2026
2
Submission Deadline
Jun 10, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Agriculture (USDA), specifically the AMS Science & Technology Program, is seeking proposals for the Installation of a Washer and Dryer in a Greenhouse facility located in Gastonia, NC. This requirement involves significant plumbing, electrical, ventilation, and structural modifications to install a customer-provided stacked washer and dryer set. This opportunity is a Total Small Business Set-Aside. Quotes are due June 10, 2026, at 1 p.m. ET.

Scope of Work

The contractor will provide all labor, tools, equipment, materials (excluding the washer and dryer), transportation, and permits for the complete installation. Key tasks include:

  • Removal and disposal of an existing double-bowl utility sink and installation of a new single-bowl utility sink with plumbing.
  • Installation of infrastructure for a stacked washer and dryer, including a dryer exhaust vent to the exterior (requiring core drilling), a new 230VAC electrical circuit (max 30 ft run), and a 2" plumbing drain washer box with hot and cold supply lines.
  • Installation of a 120VAC, 6-gallon tank-type water heater.
  • Necessary cinder block wall demolition to tie into the existing drain line.
  • Installation of the government-furnished Samsung frontload washer and dryer, including a required stacking kit, ensuring they are leveled, secured, and fully functional.
  • Compliance with all applicable codes, maintaining a clean and safe work environment, and providing warranties for furnished equipment.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (Request for Quotations - RFQ)
  • Contract Type: Anticipated award on Standard Form 1442.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Y1JZ (Construction Of Miscellaneous Buildings)
  • Place of Performance: Gastonia, NC 28054
  • Period of Performance: Work to commence within 5 calendar days after Notice to Proceed and be completed within 45 days.
  • Estimated Magnitude: Less than $25,000.
  • Bonds: No bonds are required.

Submission & Evaluation

  • Submission Deadline: June 10, 2026, at 1 p.m. ET.
  • Submission Method: Email complete quote package to james.g.roloff@usda.gov.
  • Required Quote Package: Completed RFQ form, demonstration of relevant experience, and past performance information.
  • Evaluation Criteria: Lowest Price, Technically Acceptable (LPTA). Only the lowest priced quote will be evaluated for technical acceptability; if unacceptable, the next lowest will be considered.
  • Key Deadlines:
    • Questions Due: June 5, 2026, at noon CT.
    • Site Visit: May 27, 2026, at 10 a.m. ET.

Additional Notes

Bidders must adhere to Federal Construction Wage Rates for Gaston County, NC (Attachment 2), which specifies prevailing wages and fringe benefits for various trades, as well as compliance with Executive Orders 13706 (Paid Sick Leave) and 13658 (Minimum Wage). USDA is exempt from sales tax. Quoters are strongly encouraged to conduct their own site investigations. The USDA intends to award without negotiations; omissions in quotes may result in technical unacceptability.

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 9, 2026
Installation of Washer and Dryer in Greenhouse | GovScope