Installing 3 Different Wall Signage
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
Fermi National Accelerator Laboratory (FNAL) is soliciting proposals for the supply and installation of three distinct wall signages at three locations (HEERC, D0, SBN) on the Fermilab site, adjacent to Batavia, Illinois. This opportunity is designated as a Total Small Business Set-Aside. Proposals are due on February 6, 2026, at 5:00 PM CT.
Scope of Work
The selected Subcontractor will be responsible for furnishing all required supervision, labor, materials, tools, and equipment necessary to diligently perform all work as described in the drawings and technical specifications. This includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision. The project involves the installation of signages whose placement, dimensions, and material specifications are detailed in documents like Sketch A101 and Exhibit D - FWAC Signage. Key clarifications from the Q&A include specific dimensions, fixed bases/posts (requiring potential field modification for uneven surfaces), and detailed installation drawings.
Contract & Timeline
- Opportunity Type: Solicitation (RFQ)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Proposal Due Date: February 6, 2026, at 5:00 PM CT
- Published Date: February 3, 2026 (latest amendment)
- Contract Management: Transitioned to Fermi Forward Discovery Group, LLC (FFDG) on December 31, 2024.
Key Documents & Amendments
Amendment 01 was issued on February 3, 2026, to provide responses to questions from prospective offerors and to update forms. This amendment includes the "Questions for Req 377679 3 New Signages" document, which clarifies critical details regarding signage placement, dimensions, installation, and materials. It also updates "Exhibit D - FWAC Signage," an engineering drawing detailing material specifications, dimensions, and assembly for the signage. Bidders must review these documents, especially Sketch A101, for accurate proposal development.
Submission Requirements
Offerors must acknowledge receipt of Amendment 01 by signing and returning one copy. Any changes to an already submitted offer due to this amendment must be made via email prior to the due date and time.