Intent to Procure: NSN 1680-530-3831 (Aerial Nozzle Press, (Coupler) )
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Warner Robins, GA is soliciting for a Requirements Contract for the acquisition of the HC/MC-130 Aerial Nozzle Press (Coupler), NSN: 1680-01-530-3831, Part Number: 50725. This is a non-commercial item critical for HC/MC-130 Aircrafts. The requirement is being solicited sole source to BLUEAEROSPACE LLC (CAGE 1WZW9) due to the government not owning the technical data package. However, all responsible sources may submit a capability statement, proposal, or quotation for consideration. Responses are due by February 26, 2026.
Scope of Work
This opportunity is to establish a Requirements Contract for the Aerial Nozzle Press, a component attached to refueling hoses just aft of the ejection spring. The coupler consists of a housing, locking mechanism, poppet valve, and connector, designed to prevent surges in fuel delivery pressure during aerial refueling. Its cone-shaped housing guides the receiver nozzle, and a fluid pressure system increases disconnect force.
Contract & Timeline
- Type: Requirements Contract (Solicitation)
- Item: HC/MC-130 Aerial Nozzle Press (Coupler), NSN: 1680-01-530-3831, P/N: 50725
- Set-Aside: Sole Source (BLUEAEROSPACE LLC), but open to other responsible sources for submission.
- Response Due: February 26, 2026, 22:00 UTC
- Published: January 27, 2026
Key Requirements
- Transportation: Bidders must adhere to specified F.O.B. terms (Origin/Destination) and FAR clauses (52.247-29, 52.247-53, 47.305-10). Shipping instructions for DCMA-administered contracts require contacting DCMA Transportation.
- Packaging & Marking: Compliance with international regulations for Wood Packaging Material (WPM) (debarked, heat-treated) is mandatory. Item 2 (the Coupler) requires "MIL Long Line Packaging" with specific preservation (MIL), packaging (B), unit pack weight (17 lbs), dimensions (19"x25"x15"), and cube (3.146). Marking must follow MIL-STD-129.
- Data Deliverables (CDRL): Contractors must submit an "Item Unique Identification (IUID) Marking Plan" (A001) within 30 days of award and an "IUID Marking Activity, Validation and Verification Report" (A002) quarterly.
Additional Notes
The government does not possess the technical data package for this item, justifying the sole source approach under 10 USC 2304(c)(1) and FAR 6.302-1. Interested parties should contact Jerry Latimer (Jerry.Latimer@us.af.mil) or Roberto Martinez-Perez (roberto.martinez-perez@dla.mil) for further information.