F--SC-FWS WASSAW NAT-TREATMENT INVASIVE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Fish and Wildlife Service (FWS), under the Department of the Interior, is soliciting proposals for invasive species treatment services at the Wassaw National Wildlife Refuge in Chatham County, Georgia. This Firm Fixed-Price contract is a Total Small Business Set-Aside for the eradication of Chinese tallow and Phragmites. Proposals are due by April 21, 2026, at 2:00 PM EDT.
Scope of Work
The objective is to eliminate long-term environmental degradation and protect native habitats by eradicating invasive Chinese tallow and Phragmites species. The contractor will be responsible for treating a minimum of 300 acres of Chinese tallow and 3 acres of Phragmites. Treatment methods include applying herbicides (Clearcast, AquaNeat) with backpack sprayers for seedlings and advanced regeneration, and hack-n-squirt application with Garlon 4 for sapling Chinese tallow trees. Performance standards require 99.9% removal of both species. The contractor must provide all labor, equipment, reports, maps, project photos, and Personal Protective Equipment (PPE). The government will supply herbicides, adjuvants, water, and boat/UTV transportation to and on the island.
Contract Details
- Contract Type: Firm Fixed Price
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 115310 (Support Activities for Forestry)
- Size Standard: $11.5 million
- Period of Performance: June 1, 2026, through August 31, 2026
- Place of Performance: Wassaw National Wildlife Refuge, Chatham County, Georgia, USA
Submission & Evaluation
Offerors must submit proposals that meet all solicitation requirements, including terms and conditions, representations, certifications, and technical requirements. Proposals will be evaluated based on three factors: Technical, Past Performance, and Price. The government reserves the right to award to other than the lowest-priced offer if non-cost factors outweigh the price difference. A site inspection is urged. Electronic invoicing and payment will be processed through the U.S. Department of the Treasury's IPP System.
Key Attachments
- Performance Work Statement (PWS): Details the scope, performance standards, period/place of performance, special requirements, and deliverables (initial work plan, weekly progress reports, final project report).
- Past Performance Data Document: A mandatory questionnaire requiring company, experience, personnel, subcontracting, and up to three relevant past performance references from the last three years.
- Quote Schedule: Outlines the pricing structure for Chinese Tallow (300 acres) and Phragmites (3 acres) treatments, specifying unit and total prices.
- SCA Wage Determination: Wage Determination No.: 2015-4491, Revision No.: 32, dated December 3, 2025, for Georgia counties, detailing minimum wage rates and fringe benefits for labor cost estimation.
Contact Information
- Contract POC: Fred Riley (fred_riley@ios.doi.gov, 413-253-8738)
- Technical POC: Billy (Wayne) Harris (912-660-0779)
- Alternate Technical POC: Chuck Hayes (912-210-7366)
- Proposal Due Date: April 21, 2026, at 2:00 PM Eastern Daylight Time.