J035--Patient Elopement | Installation (VA-26-00064749)

SOL #: 36C25726Q0529Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
257-NETWORK CONTRACT OFFICE 17 (36C257)
San Antonio, TX, 78240, United States

Place of Performance

Place of performance not available

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Service And Trade Equipment (J035)

Set Aside

No set aside specified

Timeline

1
Posted
May 5, 2026
2
Last Updated
Jun 16, 2026
3
Submission Deadline
Jun 15, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contracting Office 17, has issued a Solicitation (Amendment 003) for the Patient Elopement | Installation project. This opportunity seeks a qualified Service-Disabled Veteran-Owned Small Business (SDVOSB) to replace and expand a Patient Elopement and Wander Management System at the Dallas VA Medical Center and Bonham Community Living Centers. Proposals are due June 15, 2026, by 3:00 PM CDT.

Scope of Work

The project involves the purchase and installation of a new Patient Elopement and Wander Management System. This includes replacing the existing system in the Dallas CLC (Building 60) and Bonham CLC (Building 29), and expanding coverage to acute care areas 5C400, 6C400, and 7C200 within the Dallas VA Medical Center. The vendor will be responsible for all equipment installation, site preparation, electrical and data work, and the removal of legacy cabling and equipment. Compliance with the facility's Infection Control Risk Assessment (ICRA) and Interim Life Safety Measures (ILSM) is mandatory, requiring Class III/Level 3 dust containment in patient areas.

Key Requirements

The system must feature virtualized enterprise software, client workstations with proximity card readers, monitoring displays, and designated door zones with magnetic lockdown capability and alarm integration. It should support patient roaming history, zone status, customizable web-based reports, and GEO tracking, while integrating with existing fire alarm and security systems. Vendor-supplied UPS for all head-end equipment is required. Specific quantities for ID Transmitters and Banding Materials are provided in the amendments. While the SOW initially mentioned remote support and future expansion capabilities, recent amendments clarify that remote support is not allowed, and future expansion into asset/equipment tracking and staff duress functionality is not strictly required. Alternative "equal or better" wander management/elopement solutions may be proposed.

Contract Details & Timeline

  • Contract Type: Firm-Fixed-Price
  • Period of Performance: August 1, 2026 – July 31, 2027 (One year)
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a $19 Million size standard.
  • Place of Performance: Dallas VA Medical Center, 4500 S. Lancaster Road, Dallas, Texas 75216, and Bonham VA.
  • Proposal Due: June 15, 2026, 3:00 PM CDT
  • Submission: Electronically via email to Francisco.Mendoza@va.gov

Eligibility & Evaluation

This is a Total Set-Aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). Offerors must be certified SDVOSBs listed in the SBA certification database and registered in SAM. Evaluation will be a comparative process considering Technical Capability, Past Performance (3 references within 3 years), and Price. Compliance with VAAR Clause 852.219-75 (Limitations on Subcontracting) is essential.

Important Notes

Site visits, scheduled for June 4 (Dallas) and June 5 (Bonham), are not mandatory. However, bidders should review the provided architectural floor plans (D.2 Drawings), part list (D.4), and wage determination (D.5) for accurate proposal development. All questions and answers, including clarifications on system requirements and installation procedures, are detailed in Amendment 003.

People

Points of Contact

Francisco J MendozaContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Solicitation
Posted: Jun 16, 2026
View
Version 6
Solicitation
Posted: Jun 12, 2026
View
Version 5Viewing
Solicitation
Posted: Jun 9, 2026
Version 4
Solicitation
Posted: Jun 1, 2026
View
Version 3
Solicitation
Posted: May 27, 2026
View
Version 2
Solicitation
Posted: May 26, 2026
View
Version 1
Sources Sought
Posted: May 5, 2026
View
J035--Patient Elopement | Installation (VA-26-00064749) | GovScope