J045--Fan Coil Unit Replacements at VAMC West Haven, CT

SOL #: 36C24126Q0544Combined Synopsis/Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
241-NETWORK CONTRACT OFFICE 01 (36C241)
TOGUS, ME, 04330, United States

Place of Performance

West Haven, CT

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Jun 2, 2026
2
Submission Deadline
Jun 17, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically the VA Connecticut Healthcare System, is soliciting proposals for Fan Coil Unit (FCU) Replacements at the VA Medical Center in West Haven, CT. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside for verified firms. The project involves replacing two damaged FCUs, including associated chilled water, steam, electrical, and valve work, along with mandatory asbestos abatement. Proposals are due by June 17, 2026.

Scope of Work

The contractor will remove and replace two damaged fan coil units located in Room 1171 of Building B-1 (cooling only) and Room 3126B of Building B-2 (cooling and heating). This comprehensive effort requires providing all labor, materials, equipment, and supervision. Key tasks include:

  • Coordination with VA Electrical, HVAC, and Utilities personnel for system shutdowns and reconnections.
  • Protection of existing equipment and management of system shutdowns.
  • Asbestos abatement, including glove-bag removal of existing insulation and reinsulation. An independent Industrial Hygienist must be arranged.
  • Installation of new chilled water piping and associated components.
  • Adherence to stringent Infection Prevention Measures (Appendix A) for construction within a medical center, including dust control, HEPA filtration, and negative air pressure.
  • Compliance with VA Information and Information System Security/Privacy Language (Appendix B) for any work involving VA data or systems, covering security, privacy, and personnel requirements.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation for Commercial Services.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB). Offerors must be verified in the SBA VetCert database at submission and award.
  • NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors) with a $19 million size standard.
  • Place of Performance: VA Connecticut Healthcare System, West Haven VA Medical Center, 950 Campbell Avenue, West Haven, CT 06516.
  • Period of Performance: 30 days upon contract award and Notice to Proceed.
  • Warranty: Minimum one year on all parts, labor, workmanship, and equipment.

Key Requirements & Qualifications

  • A field service representative must be located within 100 miles of the West Haven Campus.
  • Minimum three years of related experience in commercial fan coil component installation and repairs, including HVAC, steam/chilled water, and electrical systems.
  • Project staff must hold current OSHA 30 and OSHA 10 certifications.
  • Mandatory Pre-bid Walkthrough: June 10, 2026, at 9:30 a.m. at Building 15, VA Medical Center West Haven.
  • Offerors must be actively registered in SAM.gov and VISTA.

Submission & Evaluation

  • Required Submissions: Technical Proposal (OEM certifications, PM approach, safety, emergency response, parts sourcing), Past Performance (three recent/relevant contracts), Price Proposal, and SAM Registration/Reps & Certs.
  • Evaluation Factors: Technical capability (most important), Past Performance, and Price. Technical and Past Performance combined are significantly more important than Price. Award may be made without discussions.
  • Questions Deadline: June 12, 2026, 4:00 PM EST (submit in writing via email).
  • Proposal Due Date: June 17, 2026, 4:00 PM EST.
  • Submission Method: Email to Juliette Buchanan (juliette.buchanan@va.gov).

People

Points of Contact

Juliette BuchananContract SpecialistPRIMARY

Files

Files

Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jun 2, 2026
J045--Fan Coil Unit Replacements at VAMC West Haven, CT | GovScope