J059--AMENDMENT 0001 UPLOAD REPORT AND DRAWING ELECTRICAL TESTING SERVICE SWITCHGEARS BALTIMORE VAMC 36C24526Q0229

SOL #: 36C24526Q0229Combined Synopsis/Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
245-NETWORK CONTRACT OFFICE 5 (36C245)
LINTHICUM, MD, 21090, United States

Place of Performance

Balitmore, MD

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components (J059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 14, 2026
2
Last Updated
Feb 19, 2026
3
Submission Deadline
Feb 2, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically the Network Contract Office 5 (36C245), is soliciting quotes for NETA Maintenance Testing and Inspection Services for GE PowerVac 15KV Switchgear Lineup at the Baltimore VA Medical Center, MD. This is a Total Small Business Set-Aside opportunity. An amendment (0001) has been issued to upload critical technical documents and confirm the quote submission deadline. Quotes are due by February 2, 2026, at 10:00 AM EST.

Scope of Work

The contractor will provide all labor, supervision, materials, and equipment for NETA Maintenance Testing and inspection services on the GE PowerVac 15KV Switchgear Lineup. All testing must be performed de-energized and coordinated with the VA, adhering to the latest ANSI/NETA Maintenance Testing Specifications (MTS), applicable ANSI, IEEE, NFPA standards, and manufacturer's recommendations. Specific testing includes Switchgear and Bus, Circuit Breaker, Protective Relay, PT/CT and Metering, and Additional Functional Testing. Deliverables include Field Test Data Sheets, Calibration Reports, a Summary Report, a Deficiency List, and a Final Comprehensive Test Report.

Contract Details

  • Contract Type: Firm-Fixed-Price
  • Period of Performance: February 4, 2026, to February 3, 2027
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a $19 Million size standard
  • Product Service Code: J059 (Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components)

Key Documents & Context

Amendment 0001 uploaded two significant documents:

  • "BT Electrical Panel Study Final Report of Findings": This report details 97 identified issues and deficiencies within the facility's electrical panel system, providing crucial context for potential upgrades or maintenance.
  • "DRAWINGS A712" / "A712 SUBSTATION": This document provides critical technical specifications and an equipment list for the Customer Owned Substation, essential for understanding the existing electrical infrastructure.
  • Other referenced documents include the VHA Directive 1028 (Facility Electrical Power Systems policy) and a Wage Determination for labor cost calculations.

Submission & Evaluation

  • Quotes Due: February 2, 2026, at 10:00 AM EST
  • Submission Method: Email quotes to Bill Pratt at billie.pratt@va.gov
  • Evaluation Factors: Technical Qualifications, Past Performance, and Price. Technical Qualifications and Past Performance are considered equal to Price.
  • Notes: All personnel must be OSHA 10 Certified. Electronic Funds Transfer (EFT) is the required payment method.

Contact Information

People

Points of Contact

Bill PrattContracting OfficerPRIMARY

Files

Files

Download
Download
Download
Download
View

Versions

Version 4
Award Notice
Posted: Feb 19, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Jan 28, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jan 28, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Jan 14, 2026
View