J059--689-26-1-4810-0020: Building 19 SCADA Upgrades (VA-25-00092807)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
36C24126Q0041 - J059--SCADA Upgrades - Building 19 Q&A
Is the site visit on 3 Nov mandatory to submit an offer?
Yes
for those who can t attend, will there be drawings/pictures of the SCADA system?
No, photos can be taken during walk-thru
Upon reviewing the solicitation and scope of work, it states that the contractor or technician must be OEM certified. However, the specific manufacturer required for this project is not clearly indicated. We are speculating that it may be Schweitzer Engineering Laboratories (SEL). Could you please confirm if SEL is indeed the specified manufacturer?
Yes, there are Schwitzer relays
kindly request any available drawings, as-built diagrams, control schematics, or additional documentation related to the current SCADA and switchgear control systems in Building 19
The only available information are simple one-lines of the switchgear
B-19 3rd floor one line diagram
B-19 3rd floor one line diagram drawing attached.